- Special Waste Home
- Cement Kiln Dust
- Crude Oil and Gas
- Fossil Fuel Combustion
- Mineral Processing
- Mining
Coal Combustion Residuals Impoundment Assessment Reports
Related Links
- Coal Combustion Residuals
- Information Request Responses from Electric Utilities
- Surface Impoundments with High Hazard Potential Ratings
- Frequent Questions on Assessment Reports
- Final Rule
Additional Information
As part of the U.S. Environmental Protection Agency's national effort to assess the management of coal combustion residuals (CCR), EPA released the final contractor reports assessing the structural integrity of impoundments and similar management units containing coal combustion residuals, commonly referred to as coal ash, at coal fired power plants. Most of the impoundments have been given hazard potential ratings (e.g. less than low, low, significant, high) by the state, EPA contractor, or company which are not related to the stability of the impoundments but to the potential for harm should the impoundment fail. For example, a significant hazard potential rating means impoundment failure can cause economic loss, environmental damage, or damage to infrastructure.
EPA assessed all of the known units with a dam hazard potential rating of high or significant as reported in the responses provided by electric utilities to EPAs information requests and additional units identified during the field assessments. EPA will release additional reports as they become available.
The reports being released now have been completed by contractors who are experts in the area of dam integrity, reflect the best professional judgment of the engineering firm, and are signed and stamped by a professional engineer. The reports are based on a visual assessment of the site, interviews with site personnel, and the review of geotechnical reports and studies related to the design, construction and operation of those impoundments, if available. The engineering firms also reviewed past state/federal inspections of the impoundments. EPA contractors were not authorized to conduct any physical drilling, coring or sampling while on site; however, they did review studies which may have included such information. These reports include complex engineering evaluations and use terms which may be unfamiliar to the general public. Also, the contractors were asked to rate the impoundments as satisfactory, fair, poor, or unsatisfactory, terms commonly used in the field of dam safety. Expert experience has shown that only impoundments rated as unsatisfactory pose immediate safety threats. None of the impoundments assessed so far have received an unsatisfactory rating. Impoundment ratings noted in the reports should be taken in the proper context, since a unit may be found to be structurally sound while it may receive a fair or poor rating based on other factors such as lack of information. Further, the assessments represent a "snapshot in time" of the condition of the CCR unit. Following submittal of Action Plans by the utility, the utility may have provided EPA with additional materials which indicate that the condition rating of the unit may have improved since the time of the assessment, such as meeting minimum Factors of Safety in both seismic and steady state scenarios, increasing the hydrologic and hydraulic capacity of the CCR unit, or improved operations and maintenance procedures at the CCR unit, for example.
Draft copies of these reports were reviewed by the facilities and the states for factual accuracy and their comments on the draft reports were also posted. EPA continues to review the reports and the technical recommendations, and is working with the facilities to ensure that the recommendations are implemented.
EPA provided a copy of the final report to each facility and requested that the facility implement the recommendations in the reports and provide plans for taking action. These plans are posted below when they become available. Should facilities fail to take sufficient measures, EPA will take additional action, if the circumstances warrant, and will be devoting special attention to those facilities receiving a poor rating.
For facilities that have had their units assessed and submitted their action plans, EPA has informed facility owners and operators that in addition to implementing their action plans, an ongoing, routine program to assess these units and to take necessary corrective measures is needed to ensure the units' continued structural integrity. The ongoing responsibility for this lies first with each facility's owner and operator. States also have a critical role in monitoring and overseeing these units, so the EPA is providing the states with all the information it has on the facilities in their respective states. EPA informed facility owners and operators through final letters that are posted below.
Ratings summary for the assessments:
Round 1 | Round 2 | Round 3 | Round 4 | Round 5 | Round 6 | Round 7 | Round 8 | Round 9 | Round 10 | Round 11 | Round 12 | TOTAL | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Satisfactory | 22 | 31 | 15 | 23 | 15 | 3 | 34 | 9 | 29 | 20 | 13 | 27 | 241 |
Fair | 15 | 9 | 12 | 17 | 14 | 27 | 10 | 16 | 18 | 9 | 11 | 8 | 166 |
Poor | 6 | 0 | 10 | 30 | 9 | 14 | 12 | 21 | 4 | 38 | 0 | 8 | 152 |
Unsatisfactory | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total # of Units Given Condition Ratings |
43 | 40 | 37 | 70 | 38 | 44 | 56 | 46 | 51 | 67 | 24 | 43 | 559 |
Assessment Reports
You will need Adobe Reader to view some of the files on this page. See EPAs PDF page to learn more.
Some companies have at some point claimed some information they have provided to the EPA related to their coal ash impoundments is confidential business information (CBI). EPA has, to date, reviewed each claim of CBI and has made the determination in all cases to deny the claim. All the documents have now been made publicly available and have been posted to this website. CBI claims summary here.
Summary Table for Impoundment Reports (.xls) - July 31, 2014 (Download the free Microsoft Excel Viewer)
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z |
Reports Key
- Cover Letter: Letter from EPA to facility requesting that the facility develop an Action Plan to address recommendations from the Final Report.
- Draft Report: Initial report from EPAs contractor.
- Comments: Compiles comments from EPA, state, and company on the Draft Report.
- Final Report: Incorporates comments, as appropriate, from the EPA, state, and company as well as any information/data the company provided to EPA between when the report was initially drafted and finalized.
- Company Response/Action Plan: the responses from the facility to EPAs Cover Letter.
- Final Letter: Letter from EPA to the company explaining their responsibility for ongoing routine assessment of their CCR impoundments.
A
Alabama Power Company
- Final Letter (PDF) (3 pp, 337 KB)
Alabama Power Company Barry Plant
- Cover Letter (PDF) (3 pp, 111 KB)
- Comments (PDF) (1 pg, 130 KB)
- Draft Report (PDF) (51 pp, 34.39 KB)
- Final Report (PDF) (56 pp, 9.58 KB)
- Company Response/Action Plan (PDF) (2 pp, 247 KB)
Alabama Power Company Gadsden Plant
- Cover Letter (PDF) (4 pp, 102 KB)
- Comments (PDF) (3 pg, 130 KB)
- Draft Report (PDF) (159 pg, 7.59 MB)
- Final Report (PDF) (159 pg, 8.43 MBB)
- Company Response/Action Plan (PDF) (2 pp, 77 KB)
Alabama Power Company EC Gaston Plant
- Cover Letter (PDF) (3 pp, 103 KB)
- Comments (PDF) (3 pp, 130 KB)
- Draft Report (PDF) (274 pp, 42.10 KB)
- Final Report (PDF) (271 pp, 42.12 MB)
- Company Response/Action Plan (PDF) (2 pp, 309 KB)
Alabama Power Company Gorgas Plant
- Cover Letter (PDF) (3 pp, 874 KB)
- Comments (PDF) (10 pp, 75 KB)
- Draft Report (PDF) (67 pp, 12.29 MB)
- Final Report (PDF) (69 pp, 19.80 MB)
- Company Response/Action Plan (PDF) (2 pp, 46 KB)
Alabama Power Company Greene Plant
- Cover Letter (PDF) (3 pp, 69 KB)
- Comments (PDF) (3 pp, 370 KB)
- Draft Report (PDF) (467 pp, 45.93 MB)
- Final Report (PDF) (465 pp, 45.48 KB)
- Company Response/Action Plan (PDF) (2 pp, 290 KB)
Alabama Power Company James H. Miller Plant
- Cover Letter (PDF) (5 pp, 98 KB)
- Comments (PDF) (3 pp, 125 KB)
- Draft Report (PDF) (160 pp, 8.77 MB)
- Final Report (PDF) (160 pp, 12.32 KB)
- Company Response/Action Plan (PDF) (2 pp, 666 KB)
Allegheny Energy
- Final Letter (PDF) (3 pp, 330 KB)
Allegheny Energy Pleasants Power Station
- Cover Letter (PDF) (4 pp, 25 KB)
- Comments (PDF) (16 pp, 3 MB)
- Draft Report (PDF) (83 pp, 6 MB)
- Final Report (PDF) (83 pp, 6 MB)
- Company Response/Action Plan (PDF) ( 6 pp, 2408 KB)
Allegheny Energy R Paul Smith Station
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (25 pp, 2 MB)
- Draft Report (PDF) (91 pp, 13 MB)
- Final Report (PDF) (91 pp, 7 MB)
- Company Response/Action Plan (PDF) (5 pp, 2 MB)
Allete
- Final Letter (PDF) (3 pp, 328 KB)
Allete Boswell Energy Center
- Cover Letter (PDF) (3 pp, 69 KB)
- Comments (PDF) (1 pg, 71 KB)
- Draft Report (PDF) (134 pp, 28.4 MB)
- Final Report (PDF) (134 pp, 52.7 MB)
- Company Response/Action Plan (PDF) (42 pp, 10.3M)
Allete Laskin Energy Center
- Cover Letter (PDF) (3 pp, 36 KB)
- Comments (PDF) (6 pp, 1.2 MB)
- Draft Report (PDF) (101 pp, 18.9 MB)
- Final Report (PDF) (110 pp, 18.7 MB)
- Company Response/Action Plan (PDF) (64 pp, 10.34 MB)
Alliant Energy
- Final Letter (PDF) (3 pp, 328 KB)
- Second Final Letter (PDF) (3 pp, 651 KB)
Alliant Energy
Alliant Energy Columbia Power Station
- Cover Letter (PDF) (4 pp, 37 KB)
- Comments (PDF) (7 pp, 385 KB)
- Draft Report (PDF) (149 pp, 26.4 MB)
- Final Report (PDF) (164 pp, 26.9 MB)
- Action Plan (PDF) (43 pp, 6.66 MB)
Alliant Energy Edgewater Generating Station
- Cover Letter (PDF) (4 pp, 44 KB)
- Comments (PDF) (29 pp, 2.3 MB)
- Draft Report (PDF) (321 pp, 33 MB)
- Final Report (PDF) (319 pp, 39 MB)
- Action Plan (PDF) (3 pp, 156 KB)
Alliant Energy Lansing Generating Station
- Cover Letter (PDF) (3 pp, 32 KB)
- Comments (PDF) (7 pp, 366 KB)
- Draft Report (PDF) (209 pp, 14 MB)
- Final Report (PDF) (205 pp, 12 MB)
- Company Response/Action Plan (PDF) (3 pp, 1.6 MB)
Alliant Energy ML Kapp Power Station
- Cover Letter (PDF) (6 pp, 48 KB)
- Comments (PDF) (11 pp, 658 KB)
- Draft Report (PDF) (91 pp, 9.5 MB)
- Final Report (PDF) (95 pp, 9.8 MB)
- Company Response/Action Plan (PDF) (4 pp, 194 KB)
- Supplemental Information to Final Report, Hydraulic and Hydrology Analysis (PDF) (45 pp, 1.2 MB)
Alliant Energy Nelson-Dewey Generating Station
- Cover Letter (PDF) (3 pp, 42 KB)
- Comments (PDF) (61 pp, 7 MB)
- Draft Report (PDF) (81 pp, 19 MB)
- Final Report (PDF) (79 pp, 22 MB)
- Action Plan (PDF) (3 pp, 121 KB)
Alliant Energy Rock River Generating Station
- Cover Letter (PDF) (4 pp, 43 KB)
- Comments (PDF) (7 pp, 300 KB)
- Draft Report (PDF) (121 pp, 25 MB)
- Final Report (PDF) (125 pp, 32 MB)
- Action Plan (PDF) (3 pp, 1.3 MB)
Alliant Energy Sixth Street Generating Station
- Cover Letter (PDF) (4 pp, 44 KB)
- Comments (PDF) (27 pp, 3.3 MB)
- Draft Report (PDF) (186 pp, 8.2 MB)
- Final Report (PDF) (214 pp, 11 MB)
- Action Plan (PDF) (3 pp, 146 KB)
Alliant Energy Sutherland Generating Station
- Cover Letter (PDF) (4 pp, 48 KB)
- Comments (PDF) (38 pp, 5 MB)
- Draft Report (PDF) (143 pp, 11 MB)
- Final Report (PDF) (159 pp, 11 MB)
- Action Plan (PDF) (2 pp, 120 KB)
Alliant Energy Ottumwa Generating Station
- Cover Letter (PDF) (3 pp, 38 KB)
- Comments (PDF) (8 pp, 424 KB)
- Draft Report (PDF) (245 pp, 7 MB)
- Final Report (PDF) (242 pp, 7 MB)
- Company Response/Action Plan (PDF) (3 pp, 846.30 KB)
Ameren
- Final Letter (PDF) (3 pp, 380 KB)
- Second Final Letter (PDF) (3 pp, 380 KB)
Ameren Coffeen Facility
- Cover Letter (PDF) (4 pp, 66 KB)
- Comments (PDF) (4 pp, 55 KB)
- Draft Report (PDF) (78 pp, 19 MB)
- Final Report (PDF) (78 pp, 19 MB)
- Company Response/Action Plan (PDF) (27 pp, 1.2 MB)
Ameren Duck Creek Facility
- Cover Letter (PDF) (4 pp, 190 KB)
- Comments (PDF) (4 pp, 52 KB)
- Draft Report (PDF) (98 pp, 24 MB)
- Final Report (PDF) (91 pp, 24 MB)
- Company Response/Action Plan (PDF) (27 pp, 1.2 MB)
Ameren ED Edwards Facility
- Cover Letter (PDF) (3 pp, 55 KB)
- Comments (PDF) (4 pp, 65 KB)
- Draft Report (PDF) (98 pp, 23 MB)
- Final Report (PDF) (92 pp, 23 MB)
- Company Response/Action Plan (PDF) (27 pp, 1.2 MB)
Ameren Hutsonville Power Station
- Cover Letter (PDF) (3 pp, 40 KB)
- Comments (PDF) (7 pp, 102 KB)
- Draft Report (PDF) (121 pp, 36 MB)
- Final Report (PDF) (120 pp, 36 MB)
- Company Response/Action Plan (PDF) (4 pp, 191 KB)
Ameren / Electric Energy Inc. Joppa Plant
- Cover Letter (PDF) (3 pp, 181 KB)
- Comments (PDF) (5 pp, 761 KB)
- Draft Report (PDF) (85 pp, 4.4 MB)
- Final Report (PDF) (47 pp, 2.5 MB)
- Company Response/Action Plan (PDF) (42 pp, 10.3M)
Ameren Labadie Power Station
- Cover Letter (PDF) (3 pp, 58 KB)
- Comments (PDF) (49 pp, 12 MB)
- Draft Report (PDF) (55 pp, 6 MB)
- Final Report (PDF) (56 pp, 9 MB)
- Company Response/Action Plan (PDF) (11 pp, 500 KB)
Ameren Meramec Power Station
- Cover Letter (PDF) (3 pp, 55 KB)
- Comments (PDF) (51 pp, 12 MB)
- Draft Report (PDF) (231 pp, 23 MB)
- Final Report (PDF) (360 pp, 31 MB)
- Company Response/Action Plan (PDF) (4 pp, 175 KB)
Ameren Meredosia Power Station
- Cover Letter (PDF) (4 pp, 192 KB)
- Comments (PDF) (4 pp, 65 KB)
- Draft Report (PDF) (85 pp, 58 MB)
- Final Report (PDF) (80 pp, 58 MB)
- Company Response/Action Plan (PDF) (27 pp, 1.2 MB)
Ameren Newton Power Station
- Cover Letter (PDF) (4 pp, 65 KB)
- Comments (PDF) (4 pp, 135 KB)
- Draft Report (PDF) (71 pp, 16 MB)
- Final Report (PDF) (71 pp, 16 MB)
- Company Response/Action Plan (PDF) (27 pp, 1.2 MB)
Ameren Rush Island Power Station
- Cover Letter (PDF) (3 pp, 54 KB)
- Comments (PDF) (3 pp, 430 KB)
- Draft Report (PDF) (274 pp, 47 MB)
- Final Report (PDF) (274 pp, 35 MB)
- Company Response/Action Plan (PDF) (4 pp, 155 KB)
Ameren Sioux Power Station
- Cover Letter (PDF) (3 pp, 55 KB)
- Comments (PDF) (60 pp, 14 MB)
- Draft Report (PDF) (125 pp, 32 MB)
- Final Report (PDF) (210 pp, 24 MB)
- Company Response/Action Plan (PDF) (23 pp, 1.3 MB)
American Electric Power
- Final Letter (PDF) (3 pp, 394 KB)
- Second Final Letter (PDF) (3 pp, 586 KB)
American Electric Power John E Amos Power Plant
- Cover Letter (PDF) (4 pp, 31 KB)
- Comments (PDF) (2 pp, 22 KB)
- Draft Report Bottom Ash (PDF) (43 pp, 3 MB)
- Final Report Bottom Ash (PDF) (37 pp, 22 MB)
- Draft Report Fly Ash (PDF) (35 pp, 2 MB)
- Final Report Fly Ash (PDF) (45 pp, 3 MB)
- Report Appendices (PDF) (978 pp, 112 MB)
- Company Response/Action Plan (PDF) (7 pp, 85 KB)
American Electric Power Big Sandy Power Plant
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (10 pp, 67 KB)
- Draft Report (PDF) (125 pp, 11 MB)
- Final Report (PDF) (125 pp, 10 MB)
- Company Response/Action Plan (PDF) (4 pp, 60 KB)
American Electric Power Cardinal Power Plant
- Cover Letter (PDF) (4 pp, 25 KB)
- Comments (PDF) (6 pp, 54 KB)
- Draft Report (PDF) (149 pp, 56 MB)
- Final Report (PDF) (149 pp, 55 MB)
- Company Response/Action Plan (PDF) (6 pp, 52 KB)
American Electric Power Clinch River Plant
- Cover Letter (PDF) (5 pp, 41.05 KB)
- Comments (PDF) (16 pp, 7.21 MB)
- Draft Report (PDF) (523 pp, 7.68 MB)
- Final Report (PDF) (552 pp, 10.92 MB)
- Company Response/Action Plan (PDF) (2 pp, 35.01 KB)
American Electric Power Conesville Generating Station
- Cover Letter (PDF) (5 pp, 26 KB)
- Comments (PDF) (11 pp, 255 KB)
- Draft Report (PDF) (85 pp, 6 MB)
- Final Report (PDF) (86 pp, 6 MB)
- Company Response/Action Plan (PDF) (6 pp, 210 KB)
American Electric Power General James Gavin Power Plant
- Cover Letter (PDF) (4 pp, 1.5 MB)
- Comments (PDF) (19 pp, 195 KB)
- Draft Report (PDF) (109 pp, 18 MB)
- Final Report (PDF) (111 pp, 19 MB)
- Company Response/Action Plan (PDF) (8 pp, 266 KB)
American Electric Power Glen Lyn Plant
- Cover Letter (PDF) (5 pp, 47.16 KB)
- Comments (PDF) (15 pp, 6.31 MB)
- Draft Report (PDF) (337 pp, 5.06 MB)
- Final Report (PDF) (351 pp, 8.86 MB)
- Company Response/Action Plan (PDF) (2 pp, 36.10 KB)
American Electric Power Mitchell Power Plant
- Cover Letter (PDF) (3 pp, 20 KB)
- Comments (PDF) (2 pp, 22 KB)
- Draft Report (PDF) (160 pp, 35 MB)
- Final Report (PDF) (159 pp, 27 MB)
- Company Response/Action Plan (PDF) (2 pp, 30 KB)
American Electric Power Mountaineer Power Plant
- Cover Letter (PDF) (3 pp, 21 KB)
- Comments (PDF) (2 pp, 19 KB)
- Draft Report (PDF) (39 pp, 7 MB)
- Final Report (PDF) (39 pp, 4 MB)
- Company Response/Action Plan (PDF) (3 pp, 36 KB)
American Electric Power Muskingum Power Plant
- Cover Letter (PDF) (6 pp, 30 KB)
- Comments (PDF) (18 pp, 485 KB)
- Draft Report (PDF) (182 pp, 10 MB)
- Final Report (PDF) (181 pp, 12 MB)
- Company Response/Action Plan (PDF) (8 pp, 79 KB)
American Electric Power Picway Generating Station
- Cover Letter (PDF) (4 pp, 44 KB)
- Comments (PDF) (3 pp, 63 KB)
- Draft Report (PDF) (61 pp, 7 MB)
- Final Report (PDF) (228 pp, 9 MB)
- Action Plan (PDF) (3 pp, 43 KB)
American Electric Power PSC of OK Northeastern 3 and 4 Plant
- Cover Letter (PDF) (4 pp, 42.61 KB)
- Comments (PDF) (6 pp, 227.19 KB)
- Draft Report (PDF) (231 pp, 4.14 MB)
- Final Report (PDF) (284 pp, 8.44 MB)
- Company Response/Action Plan (PDF) (1 p, 54.74 KB)
American Electric Power PSC of OK Oklaunion Power Station
- Cover Letter (PDF) (4 pp, 42.22 KB)
- Comments (PDF) (5 pp, 208.17 KB)
- Draft Report (PDF) (194 pp, 2.86 MB)
- Final Report (PDF) (227 pp, 3.26 MB)
- Company Response/Action Plan (PDF) (1 p, 29.44 KB)
American Electric Power Philip Sporn Generating Plant
- Additional Information Regarding AEPs Philip Sporn Power Plant in New Haven, West Virginia
- Cover Letter (PDF) (1 pg, 16 KB)
- Comments (PDF) (7 pp, 91 KB)
- Draft Report (PDF) (88 pp, 8M)
- Final Report (PDF) (97 pp, 7M)
- AEP Response to Recommendations (PDF) (173 pp, 10M)
- AEP Supplemental Information (PDF) (10 pp, 760 KB)
- Evaluation of AEP Response (PDF) (6 pp, 75 KB)
- Information Request Letter (PDF) (10 pp, 456 KB)
- Information Request Letter Modification (PDF) (1 pg, 39 KB)
American Electric Power Rockport Power Plant
- Cover Letter (PDF) (3 pp, 49.03 KB)
- Comments (PDF) (1 p, 10.76 KB)
- Draft Report (PDF) (32 pp, 2.61 MB)
- Final Report (PDF) (31 pp, 2.60 MB)
- Company Response/Action Plan (PDF) (1 p, 47.09 KB)
American Electric Power Southwestern Electric Power Co Flint Creek Power Station
- Cover Letter (PDF) (4 pp, 34.76 KB)
- Comments (PDF) (5 pp, 238.53 KB)
- Draft Report (PDF) (377 pp, 4.84 MB)
- Final Report (PDF) (311 pp, 4.74 MB)
- Company Response/Action Plan (PDF) (1 p, 26.91 KB)
American Electric Power Southwestern Electric Power Co Pirkey Power Station
- Cover Letter (PDF) (6 pp, 78.15 KB)
- Comments (PDF) (8 pp, 357.82 KB)
- Draft Report (PDF) (124 pp, 16.62 MB)
- Final Report (PDF) (131 pp, 9.62 MB)
- Company Response/Action Plan (PDF) (5 pp, 272.40 KB)
American Electric Power Tanner Creek Facility
- Cover Letter (PDF) (3 pp, 914 KB)
- Comments - Bottom Ash and Fly Ash (PDF) (3 pp, 28 KB)
- Draft Report Bottom Ash (PDF) (40 pp, 27 MB)
- Final Report Bottom Ash (PDF) (40 pp, 6 MB)
- Draft Report Fly Ash (PDF) (54 pp, 31 MB)
- Final Report Fly Ash (PDF) (44 pp, 7 MB)
- Company Response/Action Plan (PDF) (2 pp, 290 KB)
American Electric Power Welsh Plant
- Cover Letter (PDF) (4 pp, 56 KB)
- Comments (PDF) (8 pp, 203 KB)
- Draft Report (PDF) (581 pp, 25 MB)
- Final Report (PDF) (579 pp, 25 MB)
- Company Response/Action Plan (PDF) (2 pp, 26 KB)
Arizona Electric Power Cooperative Inc
- Final Letter (PDF) (3 pp, 325 KB)
Arizona Electric Power Cooperative Inc Apache Power Station
- Cover Letter (PDF) (3 pp, 41 KB)
- Comments (PDF) (22 pp, 4.5 MB)
- Draft Report (PDF) (157 pp, 24 MB)
- Final Report (PDF) (159 pp, 24 MB)'
- Supplemental Information (PDF) (14 pp, 4 MB)
- Company Response/Action Plan (PDF) (6 pp, 852 KB)
Arizona Public Service
- Final Letter (PDF) (3 pp, 333 KB)
Arizona Public Service Cholla Power Station
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (7 pp, 468 KB)
- Draft Report (PDF) (167 pp, 29 MB)
- Final Report (PDF) (150pp, 28 MB)
- Company Response/Action Plan (PDF) (5 pp, 3.5 MB)
Arizona Public Service Four Corners Power Station
- Cover Letter (PDF) (3 pp, 948 KB)
- Comments (PDF) (13 pp, 754 KB)
- Draft Report (PDF) (43 pp, 434 KB)
- Final Report (PDF) (125 pp, 13 MB)
- Company Response/Action Plan (PDF) (4 pp, 119 KB)
Associated Electric Cooperative
- Final Letter (PDF) (3 pp, 333 KB)
Associated Electric Cooperative New Madrid Power Plant
- Cover Letter (PDF) (4 pp, 38 KB)
- Comments (PDF) (3 pp, 515 KB)
- Draft Report (PDF) (138 pp, 36.8 MB)
- Final Report (PDF) (154 pp, 36.6 MB)
- Company Response/Action Plan (PDF) (5 pp, 1.19 MB)
Associated Electric Cooperative Thomas Hill Energy Center
- Cover Letter (PDF) (3 pp, 39 KB)
- Comments (PDF) (3 pp, 415 KB)
- Draft Report (PDF) (63 pp, 5.4 MB)
- Final Report (PDF) (64 pp, 5.7 MB)
- Company Response/Action Plan (PDF) (2 pp, 623.68)
Top of Page | Top of Report Results
B
Basin Electric Power Cooperative
- Final Letter (PDF) (3 pp, 318 KB)
- Second Final Letter (PDF) (3 pp, 586 KB)
Basin Electric Power Cooperative Antelope Valley Station
- Cover Letter (PDF) (4 pp, 44 KB)
- Comments (PDF) (12 pp, 950 KB)
- Draft Report (PDF) (72 pp, 10.5 MB)
- Final Report (PDF) (72 pp, 9.1 MB)
- Company Response/Action Plan (PDF) (2 pp, 34.76 KB)
Basin Electric Power Cooperative Laramie Power Station
- Cover Letter (PDF) (4 pp, 44 KB)
- Comments (PDF) (9 pp, 320 KB)
- Draft Report (PDF) (107 pp, 11 MB)
- Final Report (PDF) (123 pp, 11 MB)
- Action Plan (PDF) (2 pp, 99 KB)
Basin Electric Power Cooperative Leland Olds Power Station
- Cover Letter (PDF) (4 pp, 43 KB)
- Comments (PDF) (10 pp, 1.8 MB)
- Draft Report (PDF) (74 pp, 13.3 MB)
- Final Report (PDF) (73 pp, 13.5 MB)
- Company Response/Action Plan (PDF) (2 pp, 469.27 KB)
Big Rivers Electric Cooperative
- Final Letter (PDF) (3 pp, 332 KB)
Big Rivers Electric Cooperative Coleman Generating Station
- Cover Letter (PDF) (4 pp, 24 KB)
- Comments (PDF) (9 pp, 264 KB)
- Draft Report (PDF) (77 pp, 6 MB)
- Final Report (PDF) (77 pp, 6 MB)
- Company Response/Action Plan (PDF) (2 pp, 1032 KB)
Big Rivers Electric Cooperative Reid/Green/HMPL
- Cover Letter (PDF) (4 pp, 24 KB)
- Comments (PDF) (7 pp, 110 KB)
- Draft Report (PDF) (55 pp, 5 MB)
- Final Report (PDF) (55 pp, 5 MB)
- Company Response/Action Plan (PDF) (4 pp, 119 KB)
Top of Page | Top of Report Results
C
City of Ames
- Final Letter (PDF) (4 pp, 574 KB)
City of Ames (IA) - Ames Power Plant
- Cover Letter (PDF) (4 pp, 236 KB)
- Comments (PDF) (45 pp, 10.12 MB)
- Draft Report (PDF) (113 pp, 16.12 MB)
- Final Report (PDF) (161 pp, 26.22 MB)
- Company Response/Action Plan (PDF) (5 pp, 121 KB)
City of Columbia
- Final Letter (PDF) (3 pp, 586 KB)
City of Columbia - Columbia Municipal Power Plant
- Cover Letter (PDF) (6 pp, 131 KB)
- Comments (PDF) (3 pp, 111 KB)
- Draft Report (PDF) (180 pp, 13.67 MB)
- Final Report (PDF) (181 pp, 16.66 MB)
- Company Response/Action Plan (PDF) (2 pp, 128 KB)
City of Grand Haven
- Final Letter (PDF) (3 pp, 585 KB)
City of Grand Haven - JB Sims Power Plant
- Cover Letter (PDF) (4 pp, 106 KB)
- Comments (PDF) (93 pp, 10 MB)
- Draft Report (PDF) (126 pp, 9.40 MB)
- Final Report (PDF) (222 pp, 19.62 MB)
- Company Response/Action Plan (PDF) (x pp, x KB)
City of Independence (MO)
- Final Letter (PDF) (3 pp, 327 KB)
City of Independence (MO) Blue Valley Power Station
- Cover Letter (PDF) (3 pp, 45 KB)
- Comments (PDF) (3 pp, 246 KB)
- Draft Report (PDF) (71 pp, 6.8 MB)
- Final Report (PDF) (71 pp, 7.3 MB)
- Company Response/Action Item (PDF) (3 pp, 940.88 KB)
City of Sikeston (MO)
- Final Letter (PDF) (3 pp, 323 KB)
City of Sikeston (MO) Sikeston Power Station
- Cover Letter (PDF) (6 pp, 183 KB)
- Comments (PDF) (2 pp, 52 KB)
- Draft Report (PDF) (85 pp, 7.6 MB)
- Final Report (PDF) (86 pp, 6.5 MB)
- Company Response/Action Plan (PDF) (2 pp, 57 KB)
City of Springfield (IL)
- Final Letter (PDF) (3 pp, 318 KB)
City of Springfield (IL) Dallman Power Station
- Cover Letter (PDF) (4 pp, 163 KB)
- Comments (PDF) (4 pp, 371 KB)
- Draft Report (PDF) (76 pp, 18.1 MB)
- Final Report (PDF) (77 pp, 19.6 MB)
- Company Response/Action PLan (PDF) (4 pp, 173.35 KB)
City Utilities of Springfield (MO)
- Final Letter (PDF) (3 pp, 581 KB)
City of Springfield (MO) - John Twitty Energy Center
- Cover Letter (PDF) (5 pp, 169 KB)
- Comments (PDF) (168 pp, 37.50 MB)
- Draft Report (PDF) (64 pp, 8.49 MB)
- Final Report (PDF) (153 pp, 38.13 MB)
- Company Response/Action PLan (PDF) (5 pp, 200 KB)
Cleco Power LLC
- Final Letter (PDF) (3 pp, 325 KB)
Cleco Power LLC Brame Energy Center (formerly Rodemacher Power Station)
- Cover Letter (PDF) (6 pp, 804 KB)
- Comments (PDF) (5 pp, 166 KB)
- Draft Report (PDF) (100 pp, 46 MB)
- Final Report (PDF) (109 pp, 47 MB)
- Company Response/Action Plan (PDF) (6 pp, 269 KB)
Cleco Power LLC Dolet Hills Power Station
- Cover Letter (PDF) (4 pp, 39 KB)
- Comments (PDF) (3 pp, 419 KB)
- Draft Report (PDF) (132 pp, 16.3 MB)
- Final Report (PDF) (135 pp, 16.4 MB)
- Company Response/Action Plan (PDF) (135 pp, 16.4 MB)
Coleto Creek Power
- Final Letter (PDF) (3 pp, 323 KB)
Coleto Creek Power
- Cover Letter (PDF) (6 pp, 70 KB)
- Comments (PDF) (4 pp, 986 KB)
- Draft Report (PDF) (119 pp, 7 MB)
- Final Report (PDF) (124 pp, 5.2 MB)
- Company Response/Action Plan (PDF) (3 pp, 477 KB)
Consumers Energy
- Final Letter (PDF) (3 pp, 331 KB)
Consumers Energy DE Karn Plant
- Cover Letter (PDF) (3 pp, 35 KB)
- Comments (PDF) (7 pp, 402 KB)
- Draft Report (PDF) (93 pp, 14.6 MB)
- Final Report (PDF) (107 pp, 14.6 MB)
- Company Response/Action Plan (PDF) (3 pp, 640.21 KB)
Consumers Energy JC Weadock Plant
- Cover Letter (PDF) (3 pp, 32 KB)
- Comments (PDF) (10 pp, 818 KB)
- Draft Report (PDF) (238 pp, 20.9 MB)
- Final Report (PDF) (497 pp, 35 MB)
- Company Response/Action Plan (PDF) (2 pp, 411.66 KB)
Consumers Energy JR Whiting Plant
- Cover Letter (PDF) (4 pp, 45 KB)
- Comments (PDF) (10 pp, 731 KB)
- Draft Report (PDF) (89 pp, 4.1 MB)
- Final Report (PDF) (90 pp, 5 MB)
- Company Response/Action Plan (PDF) (6 pp, 811.38 KB)
CPS Energy/City of San Antonio
- Final Letter (PDF) (3 pp, 596 KB)
J.K. Spruce Power Plant
- Cover Letter (PDF) (5 pp, 194 KB)
- Comments (PDF) (401 pp, 9.45 MB)
- Draft Report (PDF) (229 pp, 14.96 MB)
- Final Report (PDF) (286 pp, 17.64 MB)
- Company Response/Action Plan (PDF) (6 pp, 311 KB)
J.T. Deely Power Plant
- Cover Letter (PDF) (5 pp, 197 KB)
- Comments (PDF) (401 pp, 9.44 MB)
- Draft Report (PDF) (280 pp, 16.79 MB)
- Final Report (PDF) (335 pp, 17.85 MB)
- Company Response/Action Plan (PDF) (6 pp, 311 KB)
Crisp County Power Commission
- Final Letter (PDF) (4 pp, 105 KB)
Crisp County, GA - Crisp County Power Plant
- Cover Letter (PDF) (4 pp, 105 KB)
- Comments (PDF) (5 pp, 200 KB)
- Draft Report (PDF) (65 pp, 7.81 MB)
- Final Report (PDF) (68 pp, 9.76 MB)
- Company Response/Action Plan (PDF) (3 pp, x 160 KB)
Top of Page | Top of Report Results
D
Dayton Power and Light
- Final Letter (PDF) (3 pp, 338 KB)
- Second Final Letter (PDF) (3 pp, 583 KB)
Dayton Power and Light JM Stuart Station
- Cover Letter (PDF) (2 pp, 17 KB)
- Comments (PDF) (24 pp, 354 KB)
- Draft Report (PDF) (139 pp, 10 MB)
- Final Report (PDF) (168 pp, 8 MB)
- Company Response/Action Plan (PDF) (7 pp, 84 KB)
Dayton Power and Light OH Hutchings Generating Station
- Cover Letter (PDF) (4 pp, 39 KB)
- Comments (PDF) (4 pp, 142 KB)
- Draft Report (PDF) (95 pp, 12.8 MB)
- Final Report (PDF) (95 pp, 12.8 MB)
- Company Response/Action Plan (PDF) (4 pp, 141.31 KB)
Dayton Power and Light Killen Electric Generating Station
- Cover Letter (PDF) (4 pp, 43 KB)
- Comments (PDF) (4 pp, 133 KB)
- Draft Report (PDF) (79 pp, 6 MB)
- Final Report (PDF) (82 pp, 10 MB)
- Action Plan (PDF) (11 pp, 2 MB)
Detroit Edison Company
- Final Letter (PDF) (3 pp, 306 KB)
Detroit Edison Company Monroe Power Plant
- Cover Letter (PDF) (3 pp, 42 KB)
- Comments (PDF) (5 pp, 670 KB)
- Draft Report (PDF) (98 pp, 20.9 MB)
- Final Report (PDF) (120 pp, 20.8 MB)
- Company Response/Action Plan (PDF) (3 pp, 171.91 KB)
Dominion Resource Services
- Final Letter (PDF) (3 pp, 341 KB)
Dominion Bremo Power Station
- Cover Letter (PDF) (4 pp, 195 KB)
- Comments (PDF) (19 pp, 720 KB)
- Draft Report (PDF) (71 pp, 13.5 MB)
- Final Report (PDF) (72 pp, 14.2 MB)
- Company Response/Action Plan (PDF) (9 pp, 310 KB)
Dominion Chesapeake Energy Center
- Cover Letter (PDF) (3 pp, 192 KB)
- Comments (PDF) (19 pp, 721 KB)
- Draft Report (PDF) (38 pp, 3.71 MB)
- Final Report (PDF) (38 pp, 1.82 MB)
- Company Response/Action Plan (PDF) (9 pp, 310 KB)
Dominion Chesterfield Power Station
- Cover Letter (PDF) (3 pp, 173 KB)
- Comments (PDF) (19 pp, 728 KB)
- Draft Report (PDF) (53 pp, 2.8 MB)
- Final Report (PDF) (55 pp, 3.1 MB)
- Company Response/Action Plan (PDF) (9 pp, 310 KB)
Dominion Kincaid Generation
- Cover Letter (PDF) (4 pp, 181 KB)
- Comments (PDF) (3 pp, 683 KB)
- Draft Report (PDF) (41 pp, 3.2 MB)
- Final Report (PDF) (42 pp, 6.7 MB)
- Company Response/Action Plan (PDF) (2 pp, 58.16 KB)
Dominion Possum Point Power Station
- Cover Letter (PDF) (3 pp, 207 KB)
- Comments (PDF) (19 pp, 720 KB)
- Draft Report (PDF) (53 pp, 7.2 MB)
- Final Report (PDF) (55 pp, 7.8 MB)
- Company Response/Action Plan (PDF) (9 pp, 310 KB)
Duke Energy Corporation
- Final Letter (PDF) (3 pp, 383 KB)
Duke Energy Corporation Allen Steam Station
- Cover Letter (PDF) (3 pp, 856 KB)
- Comments (PDF) (5 pp, 93 KB)
- Draft Report (PDF) (68 pp, 16 MB)
- Final Report (PDF) (71 pp, 22 MB)
- Company Response/Action Plan (PDF) (35 pp, 157 KB)
Duke Energy Corporation Belews Creek Steam Station
- Cover Letter (PDF) (4pp, 24 KB)
- Comments (PDF) (6 pp, 283 KB)
- Draft Report (PDF) (70 pp, 6 MB)
- Final Report (PDF) (70 pp, 7 MB)
- Company Response/Action Plan (PDF) (5 pp, 1.4 MB)
Duke Energy Corporation Buck Steam Station
- Cover Letter (PDF) (7pp, 2 MB)
- Comments (PDF) (12 pp, 171 KB)
- Draft Report (PDF) (156 pp, 36 MB)
- Final Report (PDF) (158 pp, 36 MB)
- Company Response/Action Plan (PDF) (7 pp, 82 KB)
Duke Energy Corporation Dan River Steam Station
- Cover Letter (PDF) (4 pp, 1 MB)
- Comments (PDF) (4 pp, 27 KB)
- Draft Report (PDF) (111 pp, 20 MB)
- Final Report (PDF) (133pp, 22 MB)
- Company Response/Action Plan (PDF) (4 pp, 663 KB)
Duke Energy Corporation Lee Steam Station
- Cover Letter (PDF) (4 pp, 56 KB)
- Comments (PDF) (4 pp, 498 KB)
- Draft Report (PDF) (88 pp, 14 MB)
- Final Report (PDF) (88 pp, 7 MB)
- Company Response/Action Plan (PDF) (4 pp, 1.1 MB)
Duke Energy Corporation Marshall Steam Station
- Cover Letter (PDF) (4 pp, 976 KB)
- Comments (PDF) (6 pp, 160 KB)
- Draft Report (PDF) (67 pp, 27 MB)
- Final Report (PDF) (68 pp, 29 MB)
- Company Response/Action Plan (PDF) (4 pp, 170 KB)
Duke Energy Corporation Riverbend Power Station
- Cover Letter (PDF) (4 pp, 1 MB)
- Comments (PDF) (13 pp, 60 KB)
- Draft Report (PDF) (91 pp, 10 MB)
- Final Report Annotation Memo (1 pg, 7 KB)
- Final Report (PDF) (92 pp, 5 MB)
- Company Response/Action Plan (PDF) (5 pp, 125 KB)
Duke Energy Corporation Cliffside Steam Station
- Cover Letter (PDF) (4 pp, 41.57 KB)
- Comments (PDF) (5 pp, 229.68 KB)
- Draft Report (PDF) (294 pp, 7.32 MB)
- Final Report (PDF) (297 pp, 7.42 MB)
- Company Response/Action Plan (PDF) (4 pp, 1.11 MB)
Duke Energy Corporation East Bend Station
- Cover Letter (PDF) (3 pp, 34 KB)
- Comments (PDF) (6 pp, 915 KB)
- Draft Report (PDF) (174 pp, 10.9 MB)
- Final Report (PDF) (163 pp, 10.4 MB)
- Company Response/Action Plan (PDF) (3 pp, 72.07 KB)
Duke Energy Corporation Edwardsport Plant
- Cover Letter (PDF) (3 pp, 33 KB)
- Comments (PDF) (3 pp, 105 KB)
- Draft Report (PDF) (39 pp, 3.4 MB)
- Final Report (PDF) (38 pp, 3.3 MB)
- Company Resposne/Action Plan (PDF) (3 pp, 73.03 KB)
Duke Energy Corporation Gallagher Generating Station
- Cover Letter (PDF) (4 pp, 1.2 MB)
- Comments (PDF) (4 pp, 121 KB)
- Draft Report (PDF) (50 pp, 7.4 MB)
- Final Report (PDF) (48 pp, 2.9 MB)
- Company Response/Action Plan (PDF) (6 pp, 258.03 KB)
Duke Energy Corporation Miami Fort Generating Station
- Cover Letter (PDF) (4 pp, 24 KB)
- Comments (PDF) (8 pp, 288 KB)
- Draft Report (PDF) (91 pp, 6 MB)
- Final Report (PDF) (91 pp, 6 MB)
- Company Response/Action Plan (PDF) (5 pp, 238 KB)
Duke Energy Corporation Wabash River Generating Station
- Cover Letter (PDF) (4 pp, 194 KB)
- Comments (PDF) (33 pp, 1.74 MB)
- Draft Report (PDF) (61 pp, 9 MB)
- Final Report (PDF) (59 pp, 8.97 MB)
- Company Response/Action Plan (PDF) (5 pp, 130 KB)
Duke Energy Corporation WC Beckjord Generating Station
- Cover Letter (PDF) (4 pp, 24 KB)
- Comments (PDF) (14 pp, 400 KB)
- Draft Report (PDF) (170 pp, 9 MB)
- Final Report (PDF) (200 pp, 12 MB)
- Company Response/Action Plan (PDF) (5 pp, 174 KB)
Duke Energy Corporation WH Zimmer Station
- Cover Letter (PDF) (3 pp, 188 KB)
- Comments (PDF) (3 pp, 74 KB)
- Draft Report (PDF) (44 pp, 10.6 MB)
- Final Report (PDF) (45 pp, 10.6 MB)
- Company Response/Action Plan (PDF) (4 pp, 129 KB)
Duke Energy Corporation Cayuga Generating Station
- Cover Letter (PDF) (4 pp, 39 KB)
- Comments (PDF) (6 pp, 830 KB)
- Draft Report (PDF) (109 pp, 6.8 MB)
- Final Report (PDF) (110 pp, 6.7 MB)
- Company Response/Action Plan (PDF) (7 pp, 179.89 KB)
Duke Energy Corporation Gibson Generating Station
- Cover Letter (PDF) (4 pp, 65 KB)
- Comments (PDF) (6 pp, 247 KB)
- Draft Report (PDF) (117 pp, 20.2 MB)
- Final Report (PDF) (118 pp, 8.97 MB)
- Company Response/Action Plan (PDF) (5 pp, 130 KB)
Dynegy Midwest Generation
- Final Letter (PDF) (3 pp, 361 KB)
- Second Final Letter (PDF) (3 pp, 593 KB)
Dynegy Midwest Generation Inc Baldwin Power Station
- Cover Letter (PDF) (4 pp, 92 KB)
- Comments (PDF) (19 pp, 5 MB)
- Draft Report (PDF) (179 pp, 17 MB)
- Final Report (PDF) (180 pp, 17 MB)
- Company Response/Action Plan (PDF) (6 pp, 287 KB)
Dynegy Midwest Generation Inc Havana Power Station
- Cover Letter (PDF) (2 pp, 436 KB)
- Comments (PDF) (15 pp, 2 MB)
- Draft Report (PDF) (26 pp, 2 MB)
- Final Report (PDF) (32 pp, 4 MB)
- Final Report Appendices (PDF) (414 pp, 38 MB)
- Company Response/Action Plan (PDF) (2 pp, 27 KB)
Dynegy Midwest Generation Inc Hennepin Power Station
- Cover Letter (PDF) (4 pp, 87 KB)
- Comments (PDF) (27 pp, 7 MB)
- Draft Report (PDF) (192 pp, 11 MB)
- Final Report (PDF) (195 pp, 11 MB)
- Company Response/Action Plan (PDF) (4 pp, 173 KB)
Dynegy Midwest Generation Inc Vermilion Power Station
- Cover Letter (PDF) (3 pp, 33 KB)
- Comments (PDF) (15 pp, 3.7 MB)
- Draft Report (PDF) (81 pp, 8.4 MB)
- Final Report (PDF) (171 pp, 10.8 MB)
- Compnay Response/Action Plan (PDF) (2 pp, 37.5 KB)
Dynegy Midwest Generation Inc Wood River Power Station
- Cover Letter (PDF) (2 pp, 433 KB)
- Comments (PDF) (27 pp, 804 KB)
- Draft Report (PDF) (25 pp, 464 KB)
- Final Report (PDF) (31 pp, 617 KB)
- Final Report Appendices (PDF) (666 pp, 66 MB)
- Company Response/Action Plan (PDF) (1 pg, 7 KB)
Top of Page | Top of Report Results
E
Eastern Kentucky Power Cooperative
- Final Letter (PDF) (3 pp, 320 KB)
Eastern Kentucky Power Cooperative Dale Power Station
- Cover Letter (PDF) (7 pp, 116 KB)
- Comments (PDF) (15 pp, 5 MB)
- Draft Report (PDF) (133 pp, 25 MB)
- Final Report (PDF) (128 pp, 25 MB)
- Action Plan (PDF) (11 pp, 2.9 MB)
Eastern Kentucky Power Cooperative Spurlock Power Station
- Cover Letter (PDF) (5 pp, 41 KB)
- Comments (PDF) (4 pp, 186 KB)
- Draft Report (PDF) (255 pp, 39 MB)
- Final Report (PDF) (263 pp, 26 MB)
- Action Plan (PDF) (3 pp, 416 KB)
Edison International Homer City Generating Station
- Cover Letter (PDF) (5 pp, 40 KB)
- Comments (PDF) (8 pp, 1 MB)
- Draft Report (PDF) (240 pp, 25 MB)
- Final Report (PDF) (243 pp, 25 MB)
- Action Plan (PDF) (57 pp, 5.5 MB)
Empire District Electric Company
- Final Letter (PDF) (3 pp, 315 KB)
Empire District Electric Company Asbury Power Station
- Cover Letter (PDF) (4 pp, 43 KB)
- Comments (PDF) (3 pp, 180 KB)
- Draft Report (PDF) (86 pp, 4.9 MB)
- Final Report (PDF) (82 pp, 4.3 MB)
- Company Response/Action Plan (PDF) (2 pp, 520.66 KB)
Empire District Electric Company Riverton Generating Station
- Cover Letter (PDF) (4 pp, 43 KB)
- Comments (PDF) (3 pp, 116 KB)
- Draft Report (PDF) (55 pp, 2.6 MB)
- Final Report (PDF) (55 pp, 2.8 MB)
- Company Response/Action Plan Report (PDF) (4 pp, 483.47 KB)
E.ON
- Final Letter (PDF) (3 pp, 364 KB)
E.ON Kentucky Utilities EW Brown Plant
- Cover Letter (PDF) (4 pp, 20 KB)
- Comments (PDF) (23 pp, 328 KB)
- Ash Draft Report (PDF) (37 pp, 2 MB)
- Ash Final Report (PDF) (386 pp, 50 MB)
- Auxillary Draft Report (PDF) (32 pp, 3 MB)
- Auxillary Final Report (PDF) (360 pp, 58 MB)
- Company Response/Action Plan (PDF) (2 pp, 379 KB)
E.ON Kentucky Utilities Ghent Generating Station
- Cover Letter (PDF) (4 pp, 24 KB)
- Comments (PDF) (9 pp, 261 KB)
- Draft Report (PDF) (141 pp, 19 MB)
- Final Report (PDF) (141 pp, 19 MB)
- Company Response/Action Plan (PDF) (2 pp, 289 KB)
E.ON Louisville Gas & Electric Co. Mill Creek Station
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (6 pp, 104 KB)
- Draft Report (PDF) (44 pp, 4 MB)
- Final Report (PDF) (44 pp, 4 MB)
- Company Response/Action Plan (PDF) (2 pp, 600 KB)
E.ON Louisville Gas & Electric Co. Cane Run Station
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (229 pp, 29 MB)
- Draft Report (PDF) (82 pp, 5 MB)
- Final Report (PDF) (84 pp, 5 MB)
- Company Response/Action Plan (PDF) (3 pp, 821 KB)
Top of Page | Top of Report Results
F
First Energy Generation Corporation
- Final Letter (PDF) (3 pp, 356 KB)
- Second Final Letter (PDF) (3 pp, 636 KB)
Allegheny Energy Hatfield's Ferry
- Cover Letter (PDF) (3 pp, 169 KB)
- Comments (PDF) (49 pp, 2.73 MB)
- Draft Report (PDF) (46 pp, 5.61 MB)
- Final Report (PDF) (45 pp, 5.57 MB)
- Company Response/Action Plan (PDF) ( 1 pp, 221 KB)
First Energy Corporation - Albright Power Station
- Cover Letter (PDF) (5 pp, 207 KB)
- Comments (PDF) (4 pp, 1.49 MB)
- Draft Report (PDF) (86 pp, 11.50 MB)
- Final Report (PDF) (93 pp, 17.45 MB)
- Company Response/Action Plan (PDF) (7 pp, 2.03 MB)
First Energy Generation Corporation Bruce Mansfield Power Plant
- Cover Letter (PDF) (3 pp, 20 KB)
- Comments (PDF) (1 pg, 14 KB)
- Draft Report (PDF) (78 pp, 8 MB)
- Final Report (PDF) (79 pp, 5 MB)
- Supplemental Checklists (PDF) (28 pp, 265 KB)
- Supplemental Inspections (PDF) (101 pp, 16 MB)
- Company Response/Action Plan (PDF) (3 pp, 31 KB)
First Energy Generation Corporation Bruce Mansfield Power Plant Little Blue Run Dam
- Cover Letter (PDF) (4 pp, 25 KB)
- Comments (PDF) (194 pp, 27 KB)
- Draft Report (PDF) (90 pp, 17 MB)
- Final Report (PDF) (93 pp, 7 MB)
- Company Response/Action Plan (PDF) (9 pp, 285 KB)
First Light Power Resources
- Final Letter (PDF) (4 pp, 584 KB)
First Light Power Resources Mount Tom Generating Station
- Cover Letter (PDF) (4 pp, 42 KB)
- Comments (PDF) (3 pp, 55 KB)
- Draft Report (PDF) (88 pp, 5 MB)
- Final Report (PDF) (84 pp, 5 MB)
- Company Response/Action Plan (PDF) (3 pp, 2.60 MB)
Top of Page | Top of Report Results
G
Gainsville Regional Utilities
- Final Letter (PDF) (3 pp, 589 KB)
GRU - Deerhaven Plant
- Cover Letter (PDF) (5 pp, 169 KB)
- Comments (PDF) (1343 pp, 68.13 MB)
- Draft Report (PDF) (94 pp, 8.56 MB)
- Final Report (PDF) (192 pp, 36.76 MB)
- Company Response/Action Plan (PDF) (3 pp, 842 KB)
GenOn Corporation
- Final Letter (PDF) (3 pp, 596 KB)
Conemaugh Generating Station
- Cover Letter (PDF) (4 pp, 104 KB)
- Comments (PDF) (158 pp, 13 MB)
- Draft Report (PDF) (201 pp, 8.64 MB)
- Final Report (PDF) (365 pp, 19.34 MB)
- Company Response/Action Plan (PDF) (2 pp, 591 KB)
Keystone Generating Station
- Cover Letter (PDF) (4 pp, 106 KB)
- Comments (PDF) (98 pp, 7.49 MB)
- Draft Report (PDF) (336 pp, 12.13 MB)
- Final Report (PDF) (431 pp, 19.46 MB)
- Company Response/Action Plan (PDF) (2 pp, 715 KB)
Georgia Power
- Final Letter (PDF) (3 pp, 406 KB)
Georgia Power Plant Bowen
- Cover Letter (PDF) (3 pp, 834 KB)
- Comments (PDF) (21 pp, 701 KB)
- Draft Report (PDF) (93 pp, 34.38 MB)
- Final Report (PDF) (59 pp, 3.21 MB)
- Company Response/Action Plan (PDF) (3 pp, 139 KB)
Georgia Power Plant Branch
- Cover Letter (PDF) (5 pp, 24 KB)
- Comments (PDF) (32 pp, 428 KB)
- Draft Report (PDF) (150 pp, 13.80 MB)
- Final Report (PDF) (188 pp, 18.53 MB)
- Company Response/Action Plan (PDF) (13 pp, 1983 KB)
Georgia Power Plant Hammond
- Cover Letter (PDF) (3 pp, 55 KB)
- Comments (PDF) (8 pp, 363 KB)
- Draft Report (PDF) (176 pp, 82.92 MB)
- Final Report (PDF) (177 pp, 84.31 MB)
- Company Response/Action Plan (PDF) (13 pp, 1983 KB)
Georgia Power Plant Kraft
- Cover Letter (PDF) (4 pp, 141 KB)
- Comments (PDF) (10 pp, 810 KB)
- Draft Report (PDF) (192 pp, 15.39 MB)
- Final Report (PDF) (203 pp, 13.97 MB)
- Company Response/Action Plan (PDF) (1 pg, 201 KB)
Georgia Power Plant McDonough
- Cover Letter (PDF) (4 pp, 40 KB)
- Comments (PDF) (7 pp, 330 KB)
- Draft Report (PDF) (111 pp, 24.55 MB)
- Final Report (PDF) (110 pp, 24.48 MB)
- Company Response/Action Plan (PDF) (3 pp, 117 KB)
Georgia Power Plant McIntosh
- Cover Letter (PDF) (4 pp, 134.92 KB)
- Comments (PDF) (8 pp, 474.38 KB)
- Draft Report (PDF) (367 pp, 24.12 MB)
- Final Report (PDF) (380 pp, 25.43 MB)
- Company Response/Action Plan (PDF) (2 pp, 305 KB)
Georgia Power Plant Mitchell
- Cover Letter (PDF) (5 pp, 67 KB)
- Comments (PDF) (7 pp, 336 KB)
- Draft Report (PDF) (111 pp, 43.71 MB)
- Final Report (PDF) (115 pp, 43.62 MB)
- Company Response/Action Plan (PDF) (6 pp, 236 KB)
Georgia Power Plant Scherer
- Cover Letter (PDF) (3 pp, 39 KB)
- Comments (PDF) (9 pp, 411 KB)
- Draft Report (PDF) (103 pp, 48.07 MB)
- Final Report (PDF) (108 pp, 48.90 MB)
- Company Response/Action Plan (PDF) (4 pp, 121 KB)
Georgia Power Plant Wansley
- Cover Letter (PDF) (3 pp, 49 KB)
- Comments (PDF) (5 pp, 163 KB)
- Draft Report (PDF) (438 pp, 43.83 MB)
- Final Report (PDF) (380 pp, 41.52 MB)
- Company Response/Action Plan (PDF) (3 pp, 66 KB)
Georgia Power Plant Yates
- Cover Letter (PDF) (7 pp, 76 KB)
- Comments (PDF) (9 pp, 441 KB)
- Draft Report (PDF) (155 pp, 46.31 MB)
- Final Report (PDF) (165 pp, 46.64 MB)
- Company Response/Action Plan (PDF) (10 pp, 389 KB)
Great River Energy
- Final Letter (PDF) (3 pp, 59595 KB)
Coal Creek Station
- Cover Letter (PDF) (4 pp, 48 KB)
- Second Cover Letter (PDF) (3 pp, 59595 KB)
- Comments (PDF) (192 pp, 15 MB)
- Draft Report (PDF) (226 pp, 14 MB)
- Final Report (PDF) (231 pp, 14 MB)
- Action Plan (PDF) (4 pp, 1.3 MB)
Stanton Station
- Cover Letter (PDF) (4 pp, 40 KB)
- Comments (PDF) (27 pp, 300 KB)
- Draft Report (PDF) (293 pp, 13 MB)
- Final Report (PDF) (300 pp, 18 MB)
- Action Plan (PDF) (5 pp, 1.4 MB)
Gulf Power Company
- Final Letter (PDF) (3 pp, 319 KB)
- Second Final Letter (PDF) (3 pp, 590 KB)
Gulf Power - Crist
- Cover Letter (PDF) (10 pp, 406 KB)
- Comments (PDF) (179 pp, 36.02 MB)
- Draft Report (PDF) (195 pp, 12.33 MB)
- Final Report (PDF) (397 pp, 48.20 MB)
- Company Response/Action Plan (PDF) (37 pp, 8.72 MB)
Gulf Power - Lansing Smith
- Cover Letter (PDF) (4 pp, 81 KB)
- Comments (PDF) (25 pp, 2.74 MB)
- Draft Report (PDF) (119 pp, 20.81 MB)
- Final Report (PDF) (363 pp, 40.53 MB)
- Company Response/Action Plan (PDF) (4 pp, 498 KB)
Gulf Power - Scholz
- Cover Letter (PDF) (10 pp, 4.07 MB)
- Comments (PDF) (211 pp, 16.54 MB)
- Draft Report (PDF) (122 pp, 6.75 MB)
- Final Report (PDF) (340 pp, 22.05 MB)
- Company Response/Action Plan (PDF) (14 pp, 4.44 MB)
Top of Page | Top of Report Results
H
Hoosier Energy Rural Electric Cooperative
- Final Letter (PDF) (3 pp, 353 KB)
Hoosier Energy Frank E Ratts Generating Station
- Cover Letter (PDF) (4 pp, 37 KB)
- Comments (PDF) (24 pp, 3.4 MB)
- Draft Report (PDF) (110 pp, 14.6 MB)
- Final Report (PDF) (112 pp, 14.6 MB)
- Company Response/Action Plan (PDF) (5 pp, 164.46 KB)
Top of Page | Top of Report Results
I
Indiana-Kentucky Electric Corporation
- Final Letter (PDF) (3 pp, 393 KB)
Indiana-Kentucky Electric Corporation Clifty Creek Power Station
- Cover Letter (PDF) (5 pp, 2 MB)
- Comments Bottom Ash Pond (PDF) (9 pp, 138 KB)
- Comments Fly Ash Pond (PDF) (10 pp, 138 KB)
- Draft Report Bottom Ash Pond (PDF) (60 pp, 8 MB)
- Final Report Bottom Ash Pond (PDF) (62 pp, 9 MB)
- Draft Report Fly Ash Pond (PDF) (65 pp, 8 MB)
- Final Report Fly Ash Pond (PDF) (66 pp, 9 MB)
- Company Response/Action Plan (PDF) (5 pp, 80 KB)
Indianapolis Power & Light
- Final Letter (PDF) (3 pp, 335 KB)
Indianapolis Power & Light Eagle Valley Generating Station
- Cover Letter (PDF) (4 pp, 69 KB)
- Comments (PDF) (24 pp, 4.1 MB)
- Draft Report (PDF) (160 pp, 21.7 MB)
- Final Report (PDF) (158 pp, 19.2 MB)
- Company Response/Action Plan (PDF) (10 pp, 644 KB)
Indianapolis Power & Light Harding Street Generating Station
- Cover Letter (PDF) (4 pp, 95 KB)
- Comments (PDF) (33 pp, 6.1 MB)
- Draft Report (PDF) (211 pp, 25.3 MB)
- Final Report (PDF) (210 pp, 23.7 MB)
- Company Response/Action Plan (PDF) (8 pp, 645 KB)
Indianapolis Power & Light Petersburg Generating Station
- Cover Letter (PDF) (4 pp, 68 KB)
- Comments (PDF) (8 pp, 1.8 MB)
- Draft Report (PDF) (148 pp, 15.5 MB)
- Final Report (PDF) (149 pp, 15.6 MB)
- Company Response/Action Plan (PDF) (8 pp, 674 KB)
Intermountain Power Project
- Final Letter (PDF) (3 pp, 315 KB)
Intermountain Power Project City of Los Angeles Intermountain Generating Station
- Cover Letter (PDF) (3 pp, 40 KB)
- Comments (PDF) (10 pp, 494 KB)
- Draft Report (PDF) (99 pp, 5.9 MB)
- Final Report (PDF) (100 pp, 5.6 MB)
- Company response/Action Plan (PDF) (3 pp, 193.11 KB)
- Final Letter (PDF) (3 pp, 538 KB)
Top of Page | Top of Report Results
J no entries
Top of Page | Top of Report Results
K
Kansas City Board of Public Utilities
- Final Letter (PDF) (3 pp, 548 KB)
Kansas City Board of Public Utilities Nearman Creek Power Station
- Cover Letter (PDF) (3 pp, 98 KB)
- Comments (PDF) (37 pp, 2.9 MB)
- Draft Report (PDF) (280 pp, 8.9 MB)
- Final Report (PDF) (259 pp, 7 MB)
- Company Response/Action Plan (PDF) (85 pp, 3.23 MB)
Kansas City Power & Light
- Final Letter (PDF) (3 pp, 341 KB)
Kansas City Power & Light Lake Road Generating Station
- Cover Letter (PDF) (3 pp, 44.93 KB)
- Comments (PDF) (4 pp, 121.59 KB)
- Draft Report (PDF) (65 pp, 3.22 MB)
- Final Report (PDF) (274 pp, 8.52 MB)
- Company Response/Action Plan (PDF) (2 pp, 108.62 KB)
Kansas City Power & Light La Cygne Generating Station
- Cover Letter (PDF) (3 pp, 58 KB)
- Comments (PDF) (3 pp, 136 KB)
- Draft Report (PDF) (287 pp, 37.3 MB)
- Final Report (PDF) (402 pp, 41.1 MB)
- Company Response/Action Plan (PDF) (1 p, 50.89 KB)
Kansas City Power & Light Montrose Generating Station
- Cover Letter (PDF) (3 pp, 39.56 KB)
- Comments (PDF) (4 pp, 182.23 KB)
- Draft Report (PDF) (79 pp, 7.21 MB)
- Final Report (PDF) (83 pp, 4.87 MB)
- Company Response/Action Plan (PDF) (2 pp, 99.68 KB)
Kansas City Power & Light Sibley Generating Station
- Cover Letter (PDF) (3 pp, 38 KB)
- Comments (PDF) (4 pp, 1.3 MB)
- Draft Report (PDF) (183 pp, 9 MB)
- Final Report (PDF) (195 pp, 7.7 MB)
- Company Response/Action Plan (PDF) (2 pp, 73.15 KB)
Kentucky Utilities
- Final Letter (PDF) (3 pp, 365 KB)
Kentucky Utilities Green River Station
- Cover Letter (PDF) (13 pp, 116 KB)
- Comments (PDF) (356 pp, 48.3 MB)
- Draft Report (PDF) (143 pp, 19.8 MB)
- Final Report (PDF) (164 pp, 19.8 MB)
- Company Response/Action Plan (PDF) (272 pp, 37.55 MB)
Kentucky Utilities Pineville Generating Station
- Cover Letter (PDF) (5 pp, 64 KB)
- Comments (PDF) (139 pp, 11.6 MB)
- Draft Report (PDF) (57 pp, 7.9 MB)
- Final Report (PDF) (61 pp, 8.4 MB)
- Company Response/Action Plan (PDF) (6 pp, 1.48 MB)
Kentucky Utilities Tyrone Generating Station
- Cover Letter (PDF) (5 pp, 64 KB)
- Comments (PDF) (211 pp, 11.9 MB)
- Draft Report (PDF) (73 pp, 7.1 MB)
- Final Report (PDF) (82 pp, 7.2 MB)
- Company Response/Action Plan (PDF) (8 pp, 2.2 MB)
Top of Page | Top of Report Results
L
Lansing Board of Water & Light
- Final Letter (PDF) (3 pp, 594 KB)
Lansing Board of Water & Light Erickson Station
- Cover Letter (PDF) (5 pp, 41 KB)
- Comments (PDF) (5 pp, 360 KB)
- Draft Report (PDF) (65 pp, 7 MB)
- Final Report (PDF) (67 pp, 10 MB)
- Action Plan (PDF) (5 pp, 475 KB)
Louisiana Generating LLC
- Final Letter (PDF) (3 pp, 307 KB)
Louisiana Generating LLC Big Cajun II
- Cover Letter (PDF) (4 pp, 248 KB)
- Comments (PDF) (5 pp, 112 KB)
- Draft Report (PDF) (963 pp, 40 MB)
- Final Report (PDF) (832 pp, 43 MB)
- Letter Granting EPA Permission to Release the Company Action Plan (PDF) (1 pg, 348 KB)
- Company Response/Action Plan (PDF) (4 pp, 245 KB)
Louisville Gas and Electric Power
- Final Letter (PDF) (3 pp, 366 KB)
Louisville Gas and Electric Power Trimble County Generating Station
- Cover Letter (PDF) (4 pp, 1 MB)
- Comments (PDF) (19 pp, 100 KB)
- Draft Report (PDF) (63 pp, 40 MB)
- Final Report (PDF) (63 pp, 9 MB)
- Company Response/Action Plan (PDF) (2 pp, 521 KB)
Lower Colorado River Authority
- Final Letter (PDF) (3 pp, 323 KB)
Lower Colorado River Authority Fayette Power Project
- Cover Letter(PDF) (5 pp, 64 KB)
- Comments (PDF) (133 pp, 13 MB)
- Draft Report (PDF) (117 pp, 11 MB)
- Final Report (PDF) (117 pp, 8 MB)
- Company Response/Action Plan (PDF) (5 pp, 342 KB)
Luminant Energy
- Final Letter (PDF) (3 pp, 616 KB)
Big Brown Electric Steam Station
- Cover Letter (PDF) (4 pp, 105 KB)
- Final Report (PDF) (179 pp, 5.28 MB)
- Company Response/Action Plan (PDF) (1 pg, 30 KB)
Martin Lake Electric Steam Station
- Cover Letter (PDF) (4 pp, 153 KB)
- Comments (PDF) (48 pp, 3.36 MB)
- Draft Report (PDF) (384 pp, 17.01 MB)
- Final Report (PDF) (384 pp, 17.05 MB)
- Company Response/Action Plan (PDF) (1 pp, 36 KB)
Monticello Electric Steam Station
- Cover Letter (PDF) (3 pp, 103 KB)
- Comments (PDF) (75 pp, 7.05 MB)
- Draft Report (PDF) (164 pp, 10.02 MB)
- Final Report (PDF) (174 pp, 10.28 MB)
- Company Response/Action Plan (PDF) (1 pg, 30 KB)
Oak Grove Electric Steam Station
- Cover Letter (PDF) (3 pp, 113 KB)
- Comments (PDF) (201 pp, 16.51 MB)
- Draft Report (PDF) (59 pp, 22.20 MB)
- Final Report (PDF) (233 pp, 13.90 MB)
- Company Response/Action Plan (PDF) (1 pg, 30 KB)
Top of Page | Top of Report Results
M
Mid American Energy Company
- Final Letter (PDF) (3 pp, 343 KB)
Mid American Energy Company George Neal North Energy Center
- Cover Letter (PDF) (4 pp, 66 KB)
- Comments (PDF) (260 pp, 30.5 MB)
- Draft Report (PDF) (280 pp, 37 MB)
- Final Report (PDF) (303 pp, 55.8 MB)
- Company Response/Action Plan (PDF) (134 pp, 13.85 MB)
Mid American Energy Company Louisa Generating Station
- Cover Letter (PDF) (3 pp, 59 KB)
- Comments (PDF) (259 pp, 30.5 MB)
- Draft Report (PDF) (193 pp, 11.3 MB)
- Final Report (PDF) (161 pp, 9.3 MB)
- Compnay Response/Action Plan (PDF) (2 pp, 64.37 KB)
Mid American Energy Company Riverside Generating Station
- Cover Letter (PDF) (3 pp, 60 KB)
- Comments (PDF) (21 pp, 3.5 MB)
- Draft Report (PDF) (247 pp, 31.8 MB)
- Final Report (PDF) (402 pp, 20 MB)
- Company Response/Action Plan (PDF) (32 pp, 2.48 MB)
- Supplemental Information to Final Report, Interim Geotechnical Findings (PDF) (3 pp, 332 KB)
- Supplemental Information to Final Report, Final Geotechnical Findings (PDF) (13 pp, 415 KB)
Mid American Energy Company Walter Scott Junior Energy Center
- Cover Letter (PDF) (4 pp, 68 KB)
- Comments (PDF) (17 pp, 3.2 MB)
- Draft Report (PDF) (348 pp, 37.2 MB)
- Final Report (PDF) (381 pp, 29.3 MB)
- Company response/Action PLan (PDF) (118 pp, 6.26 MB)
Minnkota Power Cooperative
- Final Letter (PDF) (3 pp, 330 KB)
Minnkota Power Cooperative Milton R Young Power Station
- Cover Letter (PDF) (4 pp, 44 KB)
- Comments (PDF) (106 pp, 6 MB)
- Draft Report (PDF) (87 pp, 4.2 MB)
- Final Report (PDF) (90 pp, 8.4 MB)
- Company Response/Action Plan (PDF) (3 pp, 710.78 KB)
Mississippi Power Company
- Final Letter (PDF) (3 pp, 313 KB)
Mississippi Power Company Plant Jack Watson
- Cover Letter (PDF) (3 pp, 64 KB)
- Comments (PDF) (31 pp, 1.80 MB)
- Draft Report (PDF) (36 pp, 8.82 MB)
- Final Report (PDF) (35 pp, 2.87 MB)
- Company Response/Action Plan (PDF) (2 pp, 405 KB)
Top of Page | Top of Report Results
N
NIPSCO (Northern Indiana Public Service Company)
- Final Letter (PDF) (3 pp, 356 KB)
- Second Final Letter (PDF) (3 pp, 613 KB)
NIPSCO (Northern Indiana Public Service Co) Bailly Generating Station
- Cover Letter (PDF) (3 pp, 38 KB)
- Comments (PDF) (2 pp, 52 KB)
- Draft Report (PDF) (92 pp, 3.3 MB)
- Final Report (PDF) (92 pp, 4.4 MB)
- Action Plan (PDF) (1 pp, 37 KB)
NIPSCO Michigan City Generating Station
- Cover Letter (PDF) (5 pp, 44 KB)
- Comments (PDF) (3 pp, 68 KB)
- Draft Report (PDF) (109 pp, 3.6 MB)
- Final Report (PDF) (486 pp, 13.5 MB)
- Action Plan (PDF) (1 pp, 37 KB)
NIPSCO DH Mitchell Generating Station
- Cover Letter (PDF) (3 pp, 38 KB)
- Comments (PDF) (2 pp, 44 KB)
- Draft Report (PDF) (87 pp, 2.4 MB)
- Final Report (PDF) (87 pp, 2.1 MB)
- Action Plan (PDF) (1 pp, 37 KB)
NIPSCO RM Schahfer Power Plant
- Cover Letter (PDF) (5 pp, 85 KB)
- Comments (PDF) (67 pp, 2.53 MB)
- Draft Report (PDF) (240 pp, 31.50 MB)
- Final Report (PDF) (238 pp, 22.08 MB)
- Company Response/Action Plan (PDF) (5 pp, 222 KB)
Northern States Sherburne County Power Station
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (10 pp, 839 KB)
- Draft Report (PDF) (151 pp, 16 MB)
- Final Report (PDF) (149 pp, 9 MB)
- Company Response/Action Plan (PDF) (7 pp, 2 MB)
NRG Energy
- Final Letter (PDF) (3 pp, 305 KB)
- Final Letter, Homer City, PA (PDF) (3 pp, 643 KB)
- Final Letter, Huntley Power, NY (PDF) (6 pp, 656 KB)
NRG - Cheswick
- Cover Letter (PDF) (4 pp, 108 KB)
- Comments (PDF) (10 pp, 2.07 KB)
- Draft Report (PDF) (121 pp, 6.97 MB)
- Final Report (PDF) (120 pp, 6.90 MB)
- Company Response/Action Plan (PDF) (4 pp, 1.98 MB)
NRG - Elrama Power Station
- Cover Letter (PDF) (4 pp, 124 KB)
- Comments (PDF) (11 pp, 1.43 MB)
- Draft Report (PDF) (72 pp, 3.96 MB)
- Final Report (PDF) (72 pp, 6.61 MB)
- Company Response/Action Plan (PDF) (6 pp, 1.92 MB)
NRG - Huntley Generating Station
- Cover Letter (PDF) (6 pp, 58 KB)
- Comments (PDF) (84 pp, 8.6 MB)
- Draft Report (PDF) (155 pp, 12 MB)
- Final Report (PDF) (204 pp, 19 MB)
- Action Plan (PDF) (2 pp, 70 KB)
- Addendum (PDF) (1 pp, 36 KB)
NRG - New Castle Power Station
- Cover Letter (PDF) (6 pp, 116 KB)
- Comments (PDF) (8 pp, 10.28 MB)
- Draft Report (PDF) (58 pp, 11.10 MB)
- Final Report (PDF) (59 pp, 2.79 MB)
- Company Response/Action Plan (PDF) (10 pp, 2.77 MB)
NRG - Shawville
- Cover Letter (PDF) (5 pp, 160 KB)
- Comments (PDF) (82 pp, 11.22 MB)
- Draft Report (PDF) (57 pp, 17 MB)
- Final Report (PDF) (136 pp, 9 MB)
- Company Response/Action Plan (PDF) (4 pp, 2 MB)
NRG - Texas Power Limestone Generating Station
- Cover Letter (PDF) (4 pp, 42.42 KB)
- Comments (PDF) (53 pp, 10.75 MB)
- Draft Report (PDF) (361 pp, 12.40 MB)
- Final Report (PDF) (426 pp, 28.59 MB)
- Company Response/Action Plan (PDF) (2 pp, 52.44 KB)
NV Energy
- Final Letter (PDF) (3 pp, 320 KB)
NV Energy Reid Gardner Generating Facility
- Cover Letter (PDF) (5 pp, 181.19 KB)
- Comments (PDF) (20 pp, 6.37 MB)
- Draft Report (PDF) (137 pp, 6.66 MB)
- Final Report (PDF) (175 pp, 9.10 MB)
- Company Response/Action Plan (PDF) (31 pp, 8.41 MB)
Top of Page | Top of Report Results
O
Ohio Valley Electric
- Final Letter (PDF) (3 pp, 306 KB)
Ohio Valley Electric Kyger Creek Power Station
- Cover Letter (PDF) (3 pp, 21 KB)
- Comments (PDF) (8 pp, 248 KB)
- Draft Report (PDF) (93 pp, 12 MB)
- Final Report (PDF) (93 pp, 19 MB)
- Company Response/Action Plan (PDF) (3 pp, 796 KB)
Otter Tail Power Company
- Final Letter (PDF) (3 pp, 587 KB)
Otter Tail Power Coyote Power Station
- Cover Letter (PDF) (5 pp, 45 KB)
- Comments (PDF) (9 pp, 1.3 MB)
- Draft Report (PDF) (119 pp, 7.3 MB)
- Final Report (PDF) (126 pp, 6.6 MB)
- Action Plan (PDF) (7 pp, 2.2 MB)
Top of Page | Top of Report Results
P
PacifiCorp Energy
- Final Letter (PDF) (3 pp, 313 KB)
- Second Final Letter (PDF) (3 pp, 584 KB)
PacifiCorp Energy Dave Johnston Power Station
- Cover Letter (PDF) (4 pp, 42 KB)
- Comments (PDF) (5 pp, 680 KB)
- Draft Report (PDF) (124 pp, 5.7 MB)
- Final Report (PDF) (154 pp, 6.7 MB)
- Company Response/Action Plan (PDF) (3 pp, 355.74 MB)
PacifiCorp Energy - Hunter Power Plant
- Cover Letter (PDF) (3 pp, 99 KB)
- Comments (PDF) (7 pp, 194 KB)
- Draft Report (PDF) (41 pp, 6.60 MB)
- Final Report (PDF) (41 pp, 7.12 MB)
- Company Response/Action Plan (PDF) (1 pg, 3 KB)
PacifiCorp Energy Jim Bridger Power Station
- Cover Letter (PDF) (4 pp, 1 MB)
- Comments (PDF) (9 pp, 418 KB)
- Draft Report (PDF) (42 pp, 400 KB)
- Final Report (PDF) (121 pp, 18 MB)
- Company Response/Action Plan (PDF) (5 pp, 68 KB)
PacifiCorp Energy Naughton Power Station
- Cover Letter (PDF) (4 pp, 23 KB)
- Comments (PDF) (9 pp, 116 KB)
- Draft Report (PDF) (152 pp, 31 MB)
- Final Report (PDF) (152 pp, 31 MB)
- Company Response/Action Plan (PDF) (3 pp, 1 MB)
PacifiCorp Energy Wyodak Power Station
- Cover Letter (PDF) (3 pp, 40 KB)
- Comments (PDF) (4 pp, 1.1 MB)
- Draft Report (PDF) (73 pp, 7.7 MB)
- Final Report (PDF) (73 pp, 8.7 MB)
- Company Response/Action Plan (PDF) (3 pp, 1.25 MB)
PowerSouth Energy Cooperative
- Final Letter (PDF) (3 pp, 324 KB)
PowerSouth Energy Cooperative Lowman Power Station
- Cover Letter (PDF) (6 pp, 110 KB)
- Comments (PDF) (113 pp, 17 MB)
- Draft Report (PDF) (200 pp, 80 MB)
- Final Report (PDF) (201 pp, 51 MB)
- Company Response/Action Plan (PDF) (5 pp, 1.1 MB)
PPL Generation LLC
- Final Letter (PDF) (3 pp, 325 KB)
- Second Final Letter (PDF) (3 pp, 591 KB)
PPL Generation LLC Brunner Island Power Station
- Cover Letter (PDF) (4 pp, 42 KB)
- Comments (PDF) (7 pp, 90 KB)
- Draft Report (PDF) (127 pp, 22 MB)
- Final Report (PDF) (435 pp, 46 MB)
- Action Plan (PDF) (2 pp, 26 KB)
PPL Generation LLC Martin's Creek Electric Station
- Cover Letter (PDF) (5 pp, 25 KB)
- Comments (PDF) (4 pp, 25 KB)
- Draft Report (PDF) (109 pp, 14 MB)
- Final Report (PDF) (109 pp, 28 MB)
- Supplemental Information (PDF) (941 pp, 70 MB)
- Company Response/Action Plan (PDF) (3 pp, 17 KB)
PPL Montana LLC Colstrip Power Plant
- Cover Letter (PDF) (5 pp, 2 MB)
- Comments (PDF) (21 pp, 4 MB)
- Draft Report (PDF) (57 pp, 502 KB)
- Final Report (PDF) (171 pp, 14 MB)
- Company Response/Action Plan (PDF) (35 pp, 157 KB)
Prarie Power/Soyland Power Cooperative
- Final Letter (PDF) (3 pp, 584 KB)
Pearl Power Plant - Pearl, IL
- Cover Letter (PDF) (5 pp, 198 KB)
- Comments (PDF) (7 pp, 194 KB)
- Draft Report (PDF) (68 pp, 13.72 MB)
- Final Report (PDF) (71 pp, 10.10 MB)
- Company Response/Action Plan (PDF) (1 pg, 222 KB)
Progress Energy Carolinas
- Final Letter (PDF) (3 pp, 341 KB)
Progress Energy Carolinas Asheville Power Station
- Cover Letter (PDF) (4 pp, 1 MB)
- Comments (PDF) (1 pg, 11 KB)
- Draft Report (PDF) (30 pp, 380 KB)
- Draft Report Appendices (142 pp, 47 MB)
- Final Report (PDF) (36 pp, 565 KB)
- Final Report Appendices (142 pp, 47 MB)
- Company Response/Action Plan (PDF) (4 pp, 104 KB)
Progress Energy Carolinas Cape Fear Power Station
- Cover Letter (PDF) (5 pp, 2 MB)
- Comments (PDF) (16 pp, 1 MB)
- Draft Report (PDF) (150 pp, 32 MB)
- Final Report (PDF) (152 pp, 33 MB)
- Company Response/Action Plan (PDF) (8 pp, 390 KB)
Progress Energy Carolinas HB Robinson
- Cover Letter (PDF) (4 pp, 45.85 KB)
- Comments (PDF) (5 pp, 1 MB)
- Draft Report (PDF) (402 pp, 35.85 MB)
- Final Report (PDF) (401 pp, 12.05 MB)
- Company Response/Action Plan (PDF) (9 pp, 2.28 MB)
Progress Energy Carolinas LV Sutton
- Cover Letter (PDF) (4 pp, 43.27 KB)
- Comments (PDF) (6 pp, 1.39 MB)
- Draft Report (PDF) (503 pp, 20.83 MB)
- Final Report (PDF) (522 pp, 25.24 MB)
- Company Response/Action Plan (PDF) (9 pp, 2.28 MB)
Progress Energy Carolinas Lee Power Station
- Cover Letter (PDF) (5 pp, 46.37 KB)
- Comments (PDF) (6 pp, 1.29 MB)
- Draft Report (PDF) (428 pp, 19.84 MB)
- Final Report (PDF) (449 pp, 19.37 MB)
- Company Response/Action Plan (PDF) (9 pp, 2.28 MB)
Progress Energy Carolinas Mayo Power Station
- Cover Letter (PDF) (3 pp, 736 KB)
- Comments (PDF) (2 pp, 911 KB)
- Draft Report (PDF) (23 pp, 138 KB)
- Draft Report Appendices (PDF) (121 pp, 18 MB)
- Final Report (PDF) (29 pp, 312 KB)
- Final Report Appendices (PDF) (127 pp, 18 MB)
- Company Response/Action Plan (PDF) (3 pp, 74 KB)
Progress Energy Carolinas Roxboro Power Station
- Cover Letter (PDF) (3 pp, 21 KB)
- Comments (PDF) (17 pp, 2 MB)
- Draft Report (PDF) (89 pp, 8 MB)
- Final Report (PDF) (88 pp, 7 MB)
- Supplemental Information (PDF) (29 pp, 316 KB)
- Company Response/Action Plan (PDF) (2 pp, 119 KB)
Progress Energy Carolinas WH Weatherspoon Steam Electric Plant
- Cover Letter (PDF) (4 pp, 48.24 KB)
- Comments (PDF) (6 pp, 1.88 MB)
- Draft Report (PDF) (575 pp, 17.92 MB)
- Final Report (PDF) (594 pp, 19.34 MB)
- Company Response/Action Plan (PDF) (9 pp, 2.28 MB)
Top of Page | Top of Report Results
Q no entries
Top of Page | Top of Report Results
R no entries
Top of Page | Top of Report Results
S
Salt River Project
- Final Letter (PDF) (3 pp, 325 KB)
Salt River Project Coronado Power Station
- Cover Letter (PDF) (4 pp, 25 KB)
- Comments (PDF) (5 pp, 166 KB)
- Draft Report (PDF) (100 pp, 46 MB)
- Final Report (PDF) (109 pp, 47 MB)
- Company Response/Action Plan (PDF) (6 pp, 804 KB)
San Miguel Electric Cooperative, Inc.
- Final Letter (PDF) (5 pp, 208 KB)
San Miguel Electric Co-op
- Cover Letter (PDF) (5 pp, 208 KB)
- Comments (PDF) (10 pp, 8.42 KB)
- Draft Report (PDF) (223 pp, 18.28 MB)
- Final Report (PDF) (232 pp, 18.90 MB)
- Company Response/Action Plan (PDF) (3 pp, 135 KB)
Santee Cooper
- Final Letter (PDF) (3 pp, 334 KB)
Santee Cooper Cross Power Station
- Cover Letter (PDF) (4 pp, 45.09 KB)
- Comments (PDF) (6 pp, 624.29 KB)
- Draft Report (PDF) (349 pp, 10.92 MB)
- Final Report (PDF) (642 pp, 11.81 MB)
- Company Response/Action Plan (PDF) (3 pp, 586.85 KB)
Santee Cooper Grainger Generating Station
- Cover Letter (PDF) (3 pp, 53 KB)
- Comments (PDF) (5 pp, 970 KB)
- Draft Report (PDF) (89 pp, 12 MB)
- Final Report (PDF) (87 pp, 7 MB)
- Company Response/Action Plan (PDF) (2 pp, 349 KB)
Santee Cooper Jefferies Generating Station
- Cover Letter (PDF) (4 pp, 57 KB)
- Comments (PDF) (7 pp, 2 MB)
- Draft Report (PDF) (125 pp, 19 MB)
- Final Report (PDF) (127 pp, 18 MB)
- Company Response/Action Plan (PDF) (4 pp, 569 KB)
Santee Cooper Winyah Generating Station
- Cover Letter (PDF) (5 pp, 61 KB)
- Comments (PDF) (12 pp, 4 MB)
- Draft Report (PDF) (355 pp, 51 MB)
- Final Report (PDF) (409 pp, 66 MB)
- Company Response/Action Plan (PDF) (5 pp, 885 KB)
South Carolina Electric & Gas
- Final Letter (PDF) (3 pp, 333 KB)
South Carolina Electric & Gas Canadys Steam Power Station
- Cover Letter (PDF) (4 pp, 47.08 KB)
- Comments (PDF) (40 pp, 3.30 MB)
- Draft Report (PDF) (366 pp, 4.75 MB)
- Final Report (PDF) (385 pp, 5.11 MB)
- Company Response/Action Plan (PDF) (2 pp, 567.29 KB)
South Carolina Electric and Gas Urquhart Generating Station
- Cover Letter (PDF) (3 pp, 45.24 KB)
- Comments (PDF) (34 pp, 2.33 MB)
- Draft Report (PDF) (233 pp, 10.96 MB)
- Final Report (PDF) (244 pp, 11.13 MB)
- Company Response/Action Plan (PDF) (2 pp, 300.99 KB)
South Carolina Electric and Gas Wateree Generating Station
- Cover Letter (PDF) (4 pp, 55 KB)
- Comments (PDF) (3 pp, 105 KB)
- Draft Report (PDF) (315 pp, 50 MB)
- Final Report (PDF) (304 pp, 48 MB)
- Company Response/Action Plan (PDF) (3 pp, 385 KB)
Southern Illinois Power Cooperative
- Final Letter (PDF) (3 pp, 677 KB)
Southern Illinois Power Cooperative Marion Power Station
- Cover Letter (PDF) (3 pp, 40 KB)
- Comments (PDF) (5 pp, 135 KB)
- Draft Report (PDF) (128 pp, 25 MB)
- Final Report (PDF) (132 pp, 6.3 MB)
Sunbury Generation LP
- Final Letter (PDF) (3 pp, 325 KB)
Sunbury Generation LP
- Cover Letter (PDF) (3 pp, 192 KB)
- Comments (PDF) (4 pp, 133 KB)
- Draft Report (PDF) (35 pp, 2.3 MB)
- Final Report (PDF) (35 pp, 2.5 MB)
- Company Response/Action Plan (PDF) (3 pp, 679 KB)
Top of Page | Top of Report Results
T
Tampa Electric Company
- Final Letter (PDF) (3 pp, 352 KB)
Tampa Electric Company Big Bend Power Station
- Cover Letter (PDF) (5 pp, 53 KB)
- Comments (PDF) (7 pp, 410 KB)
- Draft Report (PDF) (148 pp, 2 MB)
- Final Report (PDF) (175 pp, 2.5 MB)
- Company Response/Action Plan (PDF) (14 pp, 11.3 MB)
Tennessee Valley Authority
- Final Letter (PDF) (4 pp, 970 KB)
Tennessee Valley Authority Allen Fossil Plant
- Cover Letter (PDF) (4 pp, 48 KB)
- Comments (PDF) (23 pp, 3 MB)
- Draft Report (PDF) (242 pp, 15.6 MB)
- Final Report (PDF) (265 pp, 17.8 MB)
- Company Response/Action Plan (PDF) (2 pp, 54 K)
Tennessee Valley Authority Bull Run Fossil Plant
- Cover Letter (PDF) (4 pp, 46 KB)
- Comments (PDF) (6 pp, 1.3 MB)
- Draft Report (PDF) (987 pp, 48.5 MB)
- Final Report (PDF) (992 pp, 44.2 6 MB)
- Company Response/Action Plan (PDF) (7 pp, 1.4 MB)
Tennessee Valley Authority Colbert Fossil Plant
- Cover Letter (PDF) (4 pp, 45 KB)
- Comments (PDF) (6 pp, 1.3 MB)
- Draft Report (PDF) (1195 pp, 52.8 MB)
- Final Report (PDF) (1203 pp, 43.3 MB)
- Company Response/Action Plan (PDF) (5 pp, 525 KB)
Tennessee Valley Authority Cumberland Fossil Plant
- Cover Letter (PDF) (4 pp, 45 KB)
- Comments (PDF) (22 pp, 1.6 MB)
- Draft Report (PDF) (1656 pp, 43 MB)
- Final Report (PDF) (457 pp, 34.4 MB)
- Company Response/Action Plan (PDF) (3 pp, 61 K)
Tennessee Valley Authority Gallatin Fossil Plant
- Cover Letter (PDF) (4 pp, 42 KB)
- Comments (PDF) (31 pp, 7 MB)
- Draft Report (PDF) (834 pp, 22.9 MB)
- Final Report (PDF) (1134 pp, 38.2 MB)
- Company Response/Action Plan (PDF) (6 pp, 770 KB)
Tennessee Valley Authority John Sevier Fossil Plant
- Cover Letter (PDF) (4 pp, 45 KB)
- Comments (PDF) (10 pp, 1.7 MB)
- Draft Report (PDF) (470 pp, 44 MB)
- Final Report (PDF) (431 pp, 25.7 MB)
- Company Response/Action Plan (PDF) (1 p, 48 K)
Tennessee Valley Authority Johnsonville Fossil Plant
- Cover Letter (PDF) (4 pp, 46 KB)
- Comments (PDF) (26 pp, 4.9 MB)
- Draft Report (PDF) (193 pp, 12.4 MB)
- Final Report (PDF) (215 pp, 39.3 MB)
- Company Response/Action Plan (PDF) (1 p, 48 K)
Tennessee Valley Authority Kingston Fossil Plant
- Cover Letter (PDF) (4 pp, 46 KB)
- Comments (PDF) (12 pp, 1.3 MB)
- Draft Report (PDF) (588 pp, 45.8 MB)
- Final Report (PDF) (1808 pp, 355 MB)
- Company Response/Action Plan (PDF) (5 pp, 500 KB)
Tennessee Valley Authority Paradise Fossil Plant
- Cover Letter (PDF) (5 pp, 53 KB)
- Comments (PDF) (25 pp, 4.4 MB)
- Draft Report (PDF) (519 pp, 51.7 MB)
- Final Report (PDF) (549 pp, 51.5 MB)
- Company Response/Action Plan (PDF) (6 pp, 900 KB)
Tennessee Valley Authority Shawnee Fossil Plant
- Cover Letter (PDF) (3 pp, 42 KB)
- Comments (PDF) (21 pp, 6.3 MB)
- Draft Report (PDF) (741 pp, 136 MB)
- Final Report (PDF) (739 pp, 136 MB)
- Company Response/Action Plan (PDF) (1 p, 52 K)
Tennessee Valley Authority Watts Bar Fossil Plant
- Cover Letter (PDF) (3 pp, 43 KB)
- Comments (PDF) (12 pp, 1.2 MB)
- Draft Report (PDF) (203 pp, 11 MB)
- Final Report (PDF) (212 pp, 11.5 MB)
- Company Response/Action Plan (PDF) (2 pp, 59 K)
Tennessee Valley Authority Widows Creek Fossil Plant
- Cover Letter (PDF) (3 pp, 43 KB)
- Comments (PDF) (6 pp, 1.2 MB)
- Draft Report (PDF) (865 pp, 29.7 MB)
- Final Report (PDF) (840 pp, 41 MB)
- Company Response/Action Plan (PDF) (5 pp, 495 KB)
Tri-State Generation and Transmission Association Inc Escalante Power Station
- Cover Letter (PDF) (2 pp, 494 KB)
- Comments (PDF) (52 pp, 14 MB)
- Draft Report (PDF) (52 pp, 14 MB)
- Final Report (PDF) (53 pp, 14 MB)
- Company Response/Action Plan (PDF) (1 pg, 7 KB)
Top of Page | Top of Report Results
U
UGI Development Company
- Final Letter (PDF) (4 pp, 589 KB)
UGI Development Hunlock Creek Power Station
- Cover Letter (PDF) (4 pp, 48 KB)
- Comments (PDF) (5pp, 606 KB)
- Draft Report (PDF) (76 pp, 21 MB)
- Final Report (PDF) (80 pp, 20 MB)
- Action Plan (PDF) (2 pp, 441 KB)
Top of Page | Top of Report Results
V
Vectren
- Final Letter (PDF) (3 pp, 325 KB)
Vectren AB Brown Power Station
- Cover Letter (PDF) (4 pp, 1.3 MB)
- Comments (PDF) (5pp, 606 KB)
- Draft Report (PDF) (37 pp, 7.8 MB)
- Final Report (PDF) (38 pp, 13 MB)
- Draft Report Upper Ash (PDF) (35 pp, 16 MB)
- Final Report Upper Ash (PDF) (36 pp, 6 MB)
- Company Response/Action Plan (PDF) (3 pp, 541 KB)
Vectren FB Culley Power Generating Station
- Cover Letter (PDF) (4 pp, 40 KB)
- Comments (PDF) (4 pp, 40 KB)
- Draft Report (PDF) (72 pp, 6.4 MB)
- Final Report (PDF) (72 pp, 6.2 MB)
- Company Response/Action Plan(PDF) (14 pp, 3.30 MB)
Top of Page | Top of Report Results
W
Westar Energy
- Final Letter (PDF) (3 pp, 334 KB)
Westar Energy Jeffrey Energy Center
- Cover Letter (PDF) (5 pp, 1 MB)
- Comments (PDF) (49 pp, 992 KB)
- State Comments (PDF) (2pp, 82 KB)
- Draft Report (PDF) (47 pp, 452 KB)
- Final Report (PDF) (116 pp, 10 MB)
- Company Response/Action Plan (PDF) (2 pp, 489 KB)
Westar Energy Lawrence Energy Center
- Cover Letter (PDF) (3 pp, 60 KB)
- Comments (PDF) (4 pp, 130 KB)
- Draft Report (PDF) (181 pp, 42.3 MB)
- Final Report (PDF) (168 pp, 21.3 MB)
- Company Response/Action PLan (PDF) (2 pp, 51.37 KB)
Westar Energy Tecumseh Energy Center
- Cover Letter (PDF) (4 pp, 60 KB)
- Comments (PDF) (4 pp, 893 KB)
- Draft Report (PDF) (82 pp, 13.5 MB)
- Final Report (PDF) (81 pp, 12.8 MB)
- Company Response/Action Plan (PDF) (3 pp, 79.63 KB)
Western Farmers Electric Cooperative
- Final Letter (PDF) (3 pp, 320 KB)
Western Farmers Electric Cooperative Hugo Power Station
- Cover Letter (PDF) (4 pp, 50 KB)
- Comments (PDF) (4 pp, 431 KB)
- Draft Report (PDF) (91 pp, 4.8 MB)
- Final Report (PDF) (91 pp, 5.1 MB)
- Company Response/Action Plan (PDF) (113 pp, 9.3 MB)
Wisconsin Public Service Corp
- Final Letter (PDF) (3 pg, 588 KB)
Weston Power Plant Station
- Cover Letter (PDF) (4 pp, 167 KB)
- Comments (PDF) (55 pp, 3.23 MB)
- Draft Report (PDF) (327 pp, 36.45 MB)
- Final Report (PDF) (380 pp, 17.54 MB)
- Company Response/Action Plan (PDF) (1 pg, 84 KB)
Top of Page | Top of Report Results
X
Xcel Energy
- Final Letter (PDF) (3 pp, 323 KB)
- Second Final Letter (PDF) (3 pp, 585 KB)
Xcel Energy Black Dog Power Station
- Cover Letter (PDF) (3 pp, 61 KB)
- Comments (PDF) (4 pp, 2.1 MB)
- Draft Report (PDF) (167 pp, 21/1 MB)
- Final Report (PDF) (104 pp, 15.3 MB)
- Company Response/Action Plan (PDF) (4 pp, 2.33 MB)
Xcel Energy Bay Front Power Station
- Cover Letter (PDF) (4 pp, 43 KB)
- Comments (PDF) (73 pp, 4.6 MB)
- Draft Report (PDF) (84 pp, 6.2 MB)
- Final Report (PDF) (85 pp, 6 MB)
- Action Plan (PDF) (1 pp, 32 KB)
Top of Page | Top of Report Results
Y no entries
Z no entries
CBI claims
The companies in the table below have at some point claimed some information they have provided to the EPA related to their coal ash impoundments is confidential business information (CBI). While EPA reviews these claims, the information that is claimed as CBI is not posted to EPA's website. If these claims are accepted by the EPA, the coal ash reports will be posted in redacted form. If EPA denies these claims, all the information will be made publicly available and posted to this website.
Company that claims CBI | EPAs Determination |
---|---|
Alabama Power Company Barry Power Station Ernest C Gaston Power Station Gadsden Power Station Gorgas Power Station Greene County Power Station James H Miller Power Station |
|
Ameren UE Coffeen Power Station Duck Creek Power Station ED Edwards Power Station Hutsonville Power Station Labadie Power Station Meramec Power Station Meredosia Power Station Newton Power Station Sioux Power Station Rush Island Power Station |
|
Duke Energy Corporation | |
Eastern Kentucky Power Cooperative, Inc Dale Power Station HL Spurlock Station |
|
First Energy Generation Corporation Little Blue Run Dam |
|
Georgia Power Company Bowen Power Station McIntosh Power Station Plant Branch or Harlee Branch Power Station Plant Hammond Plant Kraft Plant Mitchell Plant Yates Plant McDonough Plant Scherer Wansley Power Station |
|
Gulf Power Company Lansing Smith Generating Plant Crist Generating Plant Scholz Generating Plant |
|
Mississippi Power Company Plant Jack Watson |
|
Northern Indiana Public Service Company (NIPSCO) RM Schahfer Power Plant |
|