Hudson River PCBs Superfund Site
Draft Engineering Performance Standards - Public Review Copy (May 2003)
Volume 1 of 4
Part 1: Performance Standard For Dredging Resuspension
Individual Files | Contents of Volume 1 |
Cover Letter | Executive Summary | Introduction
Resuspension Standard Attachment A: Hudson River Water Column Analysis Attachment D: Modeling Analysis Attachment E: Engineering Contingencies |
|
Volume 2 of 4
Part 2: Performance Standard For Dredging Residuals
Individual Files | Contents of Volume 2 |
Cover Letter | Executive Summary | Introduction
Residual Standard Figures | Attachment A |
|
Volume 3 of 4
Part 3: Performance Standard For Dredging Productivity
Individual Files | Contents of Volume 3 |
Cover Letter | Executive Summary | Introduction
Productivity Standard Attachment 2.0 Productivity Schedule Backup Attachment 3.0 Site Specific Quantity Development RMs 188.5 to 163.25 Subpart 3-B: Mechanical Dredging Scenario Subpart 3-C: Hydraulic Dredging Scenario |
|
Volume 4 of 4
Part 4: Case Studies of Environmental Dredging Projects
Individual Files | Contents of Volume 4 |
Cover Letter | Executive Summary | Introduction
Appendix: Case Studies of Environmental Dredging Projects |
|