Draft Engineering Performance Standards
- Peer Review Copy (October 2003)
Volume 1 of 4
Part 1: Performance Standard For Dredging Resuspension
| Individual Files |
Contents of Volume 1 |
|
Cover Letter | Executive Summary |
Introduction | Tables | Figures [2.86 MB, 188 pages]
Attachments A, B, & C[2.43
MB, 136 pages]
Attachment D [2.67. MB, 167 pages]
Attachments E, F, & G [1 MB,
94 pages]
|
Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Resuspension
2.0 Technical Basis of the Performance Standard for Dredging Resuspension
3.0 Implementation of the Performance Standard for Dredging Resuspension
4.0 Plan for Refining the Performance Standard for Dredging Resuspension
5.0 References
Tables
Figures
Attachment A Hudson River Water Column Concentration Analysis
Attachment B Resuspension Sensitivity
Attachment C Examination of Mechanisms for High Dissolved Phase
PCB Concentrations
Attachment D Modeling Analysis
Attachment E Engineering Contingencies
Attachment F Measurement Technologies
Attachment G A Discussion of Data Quality Objectives
|
Back To Top
Volume 2 of 4
Part 2: Performance Standard For Dredging Residuals
| Individual Files |
Contents of Volume 2 |
|
Cover Letter | Executive Summary | Introduction
| Residual Standards | Tables [1.75 MB, 130 pages]
Attachment A
|
Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Residuals
2.0 Technical Basis of the Performance Standard for Dredging Residuals
3.0 Implementation of the Performance Standard for Dredging Residuals
4.0 Plan for Refining the Performance Standard for Dredging Residuals
5.0 References
Tables
Figures
Attachment A Case Study Site Residual Data & New Bedford Harbor
Pre-Design Test Residual Results Evaluati
|
Back To Top
Volume 3 of 4
Part 3: Performance Standard For Dredging Productivity
| Individual Files |
Contents of Volume 3 |
|
Cover Letter | Executive Summary |
Introduction |Productivity Standards | Tables | Attachement I
[1.52 MB, 129 pages]
Attachment 2.0
Attachment 3.0 3-A [2.43
MB, 17 pages]
Ttachment 3-A (con't) | RMs 188.5
to 163.25 [2.4 MB, 8 pages]
Subpart 3-B [1.83 MB, 19 pages]
Subpart 3-C: | Attachment [2 MB, 23 pages]
|
Cover Letter
Executive Summary
Introduction
1.0 Statement of the Performance Standard for Dredging Productivity
2.0 Technical Basis of the Performance Standard for Dredging Productivity
3.0 Implementation of the Performance Standard for Dredging Productivity
4.0 Plan for Refinement of the Performance Standard for Dredging
Productivity
Tables
Figures
Attachment 1.0 Productivity Schedule
Attachment 2.0 Productivity Schedule Backup
Attachment 3.0 Site Specific Quantity Development
Subpart 3-A: Existing Sediment Characteristics
Subpart 3-B: Mechanical Dredging Scenario
Subpart 3-C: Hydraulic Dredging Scenario
Attachment 4.0 Issues Associated with Processing 4500 Tons/Day
at Moreau Landfill Site
|
Back To Top
Volume 4 of 4
Part 4: Case Studies of Environmental Dredging Projects