Jump to main content.


Facility Siting Data Summary Report Site-Specific Field Investigations of Final Candidate Sites (April 2004)

This document summarizes the findings of the field studies of each of the seven Final Candidate Sites identified in September 2003. Field studies were conducted as a component of the facility siting process for the Hudson River PCBs Superfund site. Specifically, the field studies were conducted to:

Table of Contents

LocalNavigation


Jump to main content.