Jump to main content or area navigation.

Contact Us

Technology Transfer Network
Emission Measurement Center Spectral Database

Table 3-1. FTIR Testing Schedule at T. H. Wharton Gas Fired Gas Turbine

Sampling Periods

          Run #   Loc     Sample (c)    Gas Phase    Sample        CEM      Thermal Desorption
 Date      (a)    (b)    Conditioning    Analysis     Conc.     Analyzers    Date     Time
-------   -----   ---    ------------   ---------   ---------   ---------   ------------------
5/17/93    Amb     I                                1005-1105                5/18   2226-2040
5/17/93     1      I         H/W        1804-1939   1445-1845   1449-1940    5/18   2328-2349
5/18/93     2      S                                1057-1407                5/19   0026-0049
5/18/93            I         H/W        1140-1208   1100-1500   1039-1208    5/19   2349-0014
5/18/93            I         COND       1226-1431               1209-1431
5/18/93     3      I         P/P        1521-1624   1555-1955   1432-1624    5/19   0053-0118
5/18/93            I         H/W        1635-1652               1625-1654
5/18/93    Amb     I                                2030-2130                5/18   2246-2259
5/18/93    Amb     S                                1530-1645                5/18   2304-2318

        (a)  Amb denotes an ambient sample
        (b)  Location designations; I=Gas Turbine Outlet (HRSG Inlet), S=Stack (HRSG Outlet).
        (c)  H/W = Hot/Wet Sample, COND = Condenser Sample, P/P = PermaPure Sample.

Jump to main content.