Jump to main content or area navigation.

Contact Us

Technology Transfer Network
Geographic / Ecosystems Initiatives

Hoosier Energy Inc.


  1. Name of the facility:
    Hoosier Energy Inc.

  2. Location:
    Van Buren Township, MI

  3. Distance from the US/Canada border:
    about 50 Km

  4. Type/size of the facility:
    proposed installation and operation of an electric generating facility

  5. Source of emissions:
    4 internal combustion engines

  6. Type of fuel:
    Landfill gas

  7. Type/quantity of mass emission rates:

    Pollutant

    Limit

    Method of Control

    CO

    12 tpy/ 3 g/HP*hr

    Good Combustion
    Practice (GCP) / activated C absorption pretreatment  system

    NOx

    3.6 tpy / 0.6 g/HP*hr

    GCP

    PM10

    14.84 tpy/ 0.1 g/HP*hr

    GCP

    VOC

    9 tpy/ 0.33 g/HP*hr

    GCP

    HAPs

    Total combines less than 25 tpy and each less than 10 tpy

    N/A

    Formaldehyde

    1.064 lb/hr

    N/A



  8. Emission control technology
    see table above

  9. Date permit application received:
    2/3/2009

  10. Stack height and diameter:
    stack= minimum height above ground level: 60 ft; maximum diameter: 60 in

  11. Permit agency's contact name, address, telephone number:
    Terry Wright
    Michigan Department of Environmental Quality,
    Air Quality Division,
    Constitution Hall
    525 West Allegan Street
    PO Box 30260
    Lansing, MI, 48909 - 7760
    Tel. 517-335-0100

Jump to main content.