Sumas Energy 2
- Name of the facility:
- Location:
City of Sumas, Whatcom County, Washington, USA
- Distance from the US/Canada border:
- Type/size of the facility:
National Energy Systems Company (NESCO) is to construct a 660 MW natural gas fired combined cycle power plant.
- Source of emissions:
- Type of fuel:
- Type/quantity of mass emission rates &
- Emission control technology
The two new turbines' maximum permitted potential to emit (8760 hours / yr) considering controls:
Pollutant | Emissions
(tons / yr) | Emission Control Technology |
PM10 | 209 | Good combustion practices & pipeline natural gas |
SO2 | 69 | Good combustion practices & pipeline natural gas |
NOx | 144.5 | Dry low NOx burners & SCR |
VOC | 153 | Good combustion practices, pipeline natural gas & oxidation catalyst |
CO | 88 | Oxidation catalyst |
H2SO4 | 14.3 | Good combustion practices & pipeline natural gas |
NH3 | 139 | SCR with ammonia slip limit of 5 ppm. |
- Date permit application received:
On June 1, 2004, NESCO requested an extension of the April 17, 2003 PSD permit. The existing permit expires if construction
of the facility does not begin before October 17, 2004. The application, if approved, would extend the time period during
which construction may begin to April 17, 2006. Prior to acting upon the application, EFSEC must first solicit public
comment. The public comment period for a proposed action is estimated to begin September 17, 2004.
- Stack height and diameter:
- Permit agency's contact name, address, telephone number:
State of Washington Energy Facility Site Evaluation Council
Attn: Irina Makarow
P.O. Box 43172
Olympia, WA 98504-3172
Phone: 360.956.2047
For additional information, please see http://www.efsec.wa.gov/sumas2.html
|