Region 1: EPA New England

Notices of Intent Archive: Dewatering General Permit (DGP) for MA & NH

You will need Adobe Reader to view some of the files on this page. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader.

Notices of Intent: Dewatering General Permit
City / Town, State Site / Address Permit Number Date Terminated Date Issued Date Posted
Cambridge, MA 249 Third Street, LLC (PDF) (72 pp, 19.4 MB)     02/02/2017 11/02/2016
Boston, MA Emmanuel College (PDF) (147 pp, 8.9 MB)     10/28/2016 10/03/2016
West Dennis, MA Speca Residence (PDF) (70 pp, 3.4 MB)     11/09/2016 09/27/2016
Boston, MA Government Ctr. Garage (PDF) (72 pp, 3.8 MB)     11/16/2016 08/26/2016
Boston, MA 315 Electric Avenue (PDF) (289 pp, 16.8 MB)     08/24/2016 08/16/2016
Foxboro, MA 32 Commercial Street (PDF) (53 pp, 5.2 MB)     09/22/2016 08/11/2016
Claremont, NH Prompto 10 Minute Oil Change (PDF) (9 pp, 1.9 MB)       08/02/2016
Bridgewater, MA Bridgewater Wind Turbine Project (PDF) (24 pp, 1.9 MB)     09/09/2016 08/02/2016
Boston, MA Amtrak Southampton Street Maintenance Facility (PDF) (66 pp, 6.8 MB)     08/26/2016 08/02/2016
Dighton, MA Former Zeneca Specialties (PDF) (18 pp, 6.3 MB)     07/26/2016 07/05/2016
North Reading, MA Atlantic Plaza (PDF) (63 pp, 8.4 MB)     06/14/2016 06/07/2016
Allston, MA Telford Street Condominiums (PDF) (99 pp, 8.7 MB)     06/03/2016 05/17/2016
Clinton, MA Clinton WWTP (PDF) (111 pp, 7.2 MB)     06/03/2016 05/16/2016
Westminster, MA Cumberland Farms Inc. (PDF) (79 pp, 7.5 MB)     05/13/2016 04/22/2016
Allston, MA Harvard University Soldiers Field Athletic Complex (PDF) (64 pp, 7.4 MB)     05/16/2016 04/14/2016
Boston, MA BU - Myles Standish Hall (PDF) (99 pp, 4.2 MB)     05/09/2016 04/05/2016
Scituate, MA Scituate Middle School (PDF) (35 pp, 2.7 MB)     03/31/2016 03/15/2016
Grafton, MA Grafton Wastewater Treatment Plant Improvements (PDF) (37 pp, 2.4 MB)     03/31/2016 03/04/2016
Scituate, MA Scituate Public Safety Facility (PDF) (28 pp, 1.4 MB)     03/31/2016 02/22/2016
Somerville, MA Site Revelopment at Block 5 Assembly Row Project (PDF) (132 pp, 10.2 MB)     04/01/2016 02/17/2016
Cambridge, MA Huron Avenue 40" Water Main (PDF) (44 pp, 5.6 MB)     03/31/2016 02/12/2016
Dorchester, MA 1971 – 1977 Dorchester Ave. (PDF) (149 pp, 7.2 MB) MAG070415   03/10/2016 02/12/2016
Wayland, MA Wayland Town Hall (PDF) (88 pp, 5.8 MB) MAG070414   03/10/2016 02/11/2016
Brockton, MA Good Samaritan Medical Center (PDF) (79 pp, 8.7 MB) MAG070413   03/10/2016 02/10/2016
East Boston, MA East Pier – Buildings 5 & 6 (PDF) (34 pp, 2.6 MB)     02/09/2016 01/26/2016
South Boston, MA 14 West Broadway (PDF) (60 pp, 4.2 MB)     01/26/2016 01/15/2016
N. Dartmouth, MA UMASS Dartmouth Charlton College of Business (PDF) (19 pp, 6.5 MB)     02/26/2016 12/04/2015
Boston, MA Construction Project at 136 Shawmut Ave (PDF) (126 pp, 11.9 MB)     01/13/2016 10/07/2015
Cambridge MA Mt. Auburn Hospital UST Project (PDF) (30 pp, 2 MB)     09/29/2015 09/08/2015
South Boston, MA Conley Terminal Dedicated Freight Corridor (PDF) (38 pp, 2.9 MB)     08/26/2015 08/05/2015
Boston, MA Custom House Block (PDF) (27 pp, 5.2 MB)     08/12/2015 07/29/2015
Roslindale, MA Bank of America (PDF) (45 pp, 1.8 MB)     08/11/2015 07/21/2015
Norwood, MA Bank of America (PDF) (48 pp, 4.3 MB)     08/11/2015 07/21/2015
Cambridge, MA Harvard Business School (PDF) (58 pp, 4.7 MB)     08/26/2015 07/21/2015
Cambridge, MA 350 E. Kendall F LLC – Kendall Sq. Garage Site (PDF) (42 pp, 3.4 MB)     07/24/2015 07/14/2015
Claremont, NH Prompto Oil Change (PDF) (10 pp, 2.2 MB)       07/14/2015
Cambridge, MA 650 E Kendall B LLC Site (PDF) (41 pp, 3.4 MB)     07/24/2015 07/14/2015
Boston, MA Mission Park Garage (PDF) (56 pp, 3.6 MB)     07/24/2015 07/09/2015
Brookline, MA The Growth Companies (PDF) (14 pp, 2.8 MB)     08/12/2015 06/30/2015
Ashfield, MA Ashfield Smith Branch Road Project (PDF) (22 pp, 13.3 MB)     07/08/2015 06/30/2015
Cambridge, MA 112-116 Mt. Auburn Street (PDF) (102 pp, 5.5 MB)       06/30/2015
Southbridge, MA Dexter-Russell Penstock Infiltration Mitigation (PDF) (35 pp, 5.2 MB)     05/20/2015 05/11/2015
Georgetown, MA Project at Parker River Culvert (PDF) (30 pp, 10.7 MB)     09/06/2013 08/23/2013
Ashland, MA Chestnut Street Bridge (PDF) (8 pp, 1.8 MB)     08/16/2013 08/09/2013
Boston, MA Yawkey Way Roadway Extension & Reconstruction (PDF) (63 pp, 5 MB)     07/12/2013 06/27/2013
Boston, MA 20 Somerset Street (PDF) (66 pp, 4 MB)     06/28/2013 05/16/2013
Watertown, MA Dewatering Project at 20 Summer Street, LCB Senior Living (PDF) (95 pp, 4.9 MB)     02/27/2013 02/19/2013
Cambridge, MA McKinlock Hall Renovation Project (PDF) (117 pp, 3.3 MB)     03/07/2013 02/13/2013
Cambridge, MA Dewatering from 112-116 Mt. Auburn Street (PDF) (92 pp, 3.9 MB)     01/24/2013 01/16/2013
Billerica, MA Dewatering project at 1 Republic Road, Billerica (PDF) (32 pp, 6.5 MB)     11/13/2012 10/26/2012
Newton, MA Dewatering Project at F. A. Day Middle School (PDF) (52 pp, 7 MB)     08/28/2012 08/21/2012
Rockport, MA Mill Pond Dam Reconstruction Project (PDF) (8 pp, 1 MB)     08/16/2012 07/30/2012
Glencliff, NH Dewatering Project at Glencliff Home (PDF) (17 pp, 3.5 MB)     07/20/2012 06/19/2012
Lincoln, MA Dewatering Project at Hanscom Air Force Base (PDF) (18 pp, 5.1 MB)     06/01/2012 05/22/2012
North Hampton, NH North Hampton State Beach (PDF) (12 pp, 5.1 MB)     05/22/2012 05/15/2012
Chestnut Hill, MA Boston College Chestnut Hill Lower Campus (PDF) (16 pp, 6.4 MB)     04/17/2012 04/04/2012
Boston, MA Mission Park Garage (PDF) (68 pp, 5.3 MB)     04/06/2012 03/27/2012
Chestnut Hill, MA 321 Hammon Pond Parkway (PDF) (5 pp, 3.4 MB)     04/06/2012 03/20/2012
Charlestown, MA Charlestown Parcel 3 (PDF) (7 pp, 1.1 MB)     03/28/2012 03/13/2012
Boston, MA 368 Congress Street (PDF) (7 pp, 2 MB)     02/23/2012 02/13/2012
Norwood, MA Bank of America (PDF) (86 pp, 2.7 MB)     12/20/2011 11/10/2011
Roslindale, MA 29-33 Corinth Street (PDF) (75 pp, 2.5 MB)     11/18/2011 11/10/2011
Dorchester, MA Codman Square Health & Education Ctr. (PDF) (92 pp, 5.2 MB)     11/17/2011 11/01/2011
Milford, MA Milford Water Company (PDF) (5 pp, 1.1 MB)     09/28/2011 09/20/2011
Wellfleet, MA Harborside Village Cooperative Corp. (PDF) (31 pp, 4.9 MB)     09/20/2011 09/06/2011
Franklin, NH Winnipasaukee River Basin Wastewater Treatment Plant (PDF) (11 pp, 558 K)     10/03/2011 09/06/2011
Newton, MA Old Farm Road Water Sewer Improvements Project (PDF) (4 pp, 115 K)     10/12/2011 08/31/2011
Bristol, NH PSNH Ayers Island Earthquake Remediation Project (PDF) (15 pp, 4.2 MB)     08/17/2011 08/11/2011
Webster, MA Cranston Print Works Company (PDF) (16 pp, 4.2 MB)     07/08/2011 06/27/2011
Cambridge, MA Cambridge Hospital (PDF) (67 pp, 5.1 MB)     05/27/2011 05/20/2011
Hopkinton, MA Liberty Mutual Research Group (PDF) (56 pp, 4.3 MB)     06/11/2011 05/20/2011
Brookline, MA Frederick Law Olmstead Historic House (PDF) (12 pp, 2.9 MB)     04/25/2011 04/18/2011
Cambridge, MA Longfellow National Historic House (PDF) (18 pp, 1.5 MB)     12/21/2010 12/14/2010
Cambridge, MA Kendall Square Garage (PDF) (20 pp, 607 K)     01/11/2011 12/14/2010
Boston-Cambridge, MA Longfellow Bridge Project (PDF) (13 pp, 1.8 MB)     12/17/2010 12/10/2010
Cambridge, MA 640 Memorial Drive Cambridge Facility (PDF) (12 pp, 2.8 MB)     09/24/2010 08/31/2010
Dorchester, MA Dorchester House Multi-Service Center (PDF) (5 pp, 1.3 MB)     09/02/2010 08/06/2010
Greenfield, MA Greenfield Community College (PDF) (12 pp, 2.7 MB)     07/22/2010 07/14/2010
Cambridge, MA 1075 Massachusetts Avenue (PDF) (8 pp, 1.7 MB)     07/22/2010 07/14/2010
Durham,NH Dover Road Pump Station (PDF) (9 pp, 1.7 MB)     08/06/2010 07/13/2010
Holden, MA Wachusett Street Bridge over Quinapoxet River (PDF) (8 pp, 2.1 MB)     07/09/2010 06/29/2010
Chelsea, MA 1 Webster Avenue (PDF) (20 pp, 5.3 MB)     06/09/2010 06/03/2010
Holden, MA Princeton Street Bridge (PDF) (8 pp, 2.2 MB)     06/04/2010 05/27/2010
North Andover, MA The Residences at Stevens Corner (PDF) (10 pp, 2.7 MB)     06/04/2010 05/27/2010
Boston, MA Children's Hospital Expansion (4 pp, 1.1 MB)     05/27/2010 05/13/2010
Cambridge, MA 650 E. Kendall B LLC (PDF) (4 pp, 997 K)     05/20/2010 05/06/2010
Cambridge, MA Concord Avenue (Blanchard to Alewife Brook Rotary) (PDF) (6 pp, 1.7 MB)     07/06/2010 05/06/2010
Somerville, MA 377 Summer Street Dewatering Site (PDF) (12 pp, 2.9 MB)     05/14/2010 05/03/2010
Winchester, NH Winchester Wastewater Treatment Plant Expansion Dewatering Project (PDF) (16 pp, 4.3 MB)     05/13/2010 05/03/2010
Cambridge, MA Cambridge Rindge and Latin School (PDF) (70 pp, 4.3 MB)     04/08/2010 03/30/2010
Norfolk, MA MCI Norfolk Wastewater Treatment Facility Sump Dewatering (PDF) (4 pp, 1.1 MB)     03/26/2010 03/12/2010
Falmouth, MA Falmouth Bike Path & Wigwam Road (PDF) (5 pp, 1.4 MB)     04/01/2010 02/25/2010
Natick, MA Mathworks Apple Hill 4 & West Garage (PDF) (4 pp, 1.1 MB)     03/11/2010 02/25/2010
Lowell, MA UMass. Lowell - Lowell Drainage Improvements (PDF) (9 pp, 2.2 MB)     03/11/2010 02/25/2010
Burlington, MA Netview 5 & 6 LLC c/o Nordblom Co. (PDF) (13 pp, 3.4 MB)     02/19/2010 01/26/2010
Bridgewater, MA Bridgewater State College - Conant Building (AMENDED NOI) (PDF) (14 pp, 3.1 MB)     01/26/2010 01/14/2010
Cambridge, MA Mirant Kendall Power Generation Station (PDF) (88 pp, 7.4 MB)     11/24/2009 11/16/2009
Bridgewater, MA Bridgewater State College - Conant Building (PDF) (13 pp, 1.4 MB)     11/24/2009 11/10/2009
Chelsea, MA Spencer Row Housing (PDF) (11 pp, 6 MB)     11/18/2009 11/10/2009
Cambridge, MA Biogen Idec Building 2 UST Project (PDF) (59 pp, 4.3 MB) MAG070329   04/20/2009 04/10/2009
Seabrook, NH Florida Power and Light Company - Seabrook Station Gas Insulated Switchyard (PDF) (23 pp, 1.1 MB) NHG070038   01/29/2009 01/20/2009
Springfield, MA Baystate Medical Center Hospital for the Future (PDF) (7 pp, 3.1 MB) MAG070328   01/29/2009 01/07/2009
Arlington, MA MWRA - Brattle Court Station (PDF) (14 pp, 5.6 MB) MAG070324   12/24/2008 12/09/2008
Boston, MA MWRA - Hyde Park Pumping Station (PDF) (12 pp, 4.6 MB) MAG070325   12/24/2008 12/09/2008
Brookline, MA MWRA - Reservoir Road Pumping (PDF) (12 pp, 4.5 MB) MAG070326   12/24/2008 12/09/2008
Arlington, MA MWRA - Spring Street Pumping Station (PDF) (12 pp, 4.6 MB) MAG070327   12/24/2008 12/09/2008
Boston, MA Harvard Business School, Harvard University (PDF) (46 pp, 4.5 MB) MAG070323   12/16/2008 12/09/2008
Framingham, MA Town of Framingham DPW - Herbert Street Bridge (PDF) (4 pp, 2 MB) MAG070322   01/20/2009 11/18/2008
Boston, MA Beth Israel Deaconess Medical Center (PDF) (9 pp, 3.3 MB) MAG070321   11/25/2008 11/10/2008
Quincy, MA State Street Bank (PDF) (4 pp, 1.4 MB) MAG070320   11/07/2008 11/07/2008
Methuen, MA The Aulson Company (PDF) (7 pp, 2.2 MB) MAG070318   11/06/2008 10/28/2008
Billerica, MA Shawsheen River Pump Station (PDF) (4 pp, 1.3 MB) MAG070319   10/30/2008 10/22/2008
Arlington, MA MWRA - Section 28 Suction to Brattle Street Pump Station (PDF) (11 pp, 4.5 MB) MAG070317   12/04/2008 10/20/2008
Holyoke, MA Harris Energy & Realty Corp./National Decon LLC (PDF) (19 pp, 3.5 MB) MAG070316   10/30/2008 10/20/2008
Methuen, MA City of Methuen - East Capital Street Sewer Extension (PDF) (5 pp, 2 MB) MAG070315   10/30/2008 10/20/2008
City / Town, State Site / Address Permit Number Date Terminated Date Issued Date Posted