RELATIVE_HUMIDITY : Sensor unwired. |
03-JAN-16 |
WINDSPEED_SCALAR : Sensor unwired. |
03-JAN-16 |
SIGMA_THETA : Sensor unwired. |
03-JAN-16 |
WIND_DIRECTION : Sensor unwired. |
03-JAN-16 |
WINDSPEED : Sensor unwired. |
03-JAN-16 |
TEMP2 : Sensor unwired. |
03-JAN-16 |
SHELTER_TEMPERATURE : A/C and Heat logger control installed. |
03-JAN-16 |
TEMPERATURE : 9m temperature measurement with passive aspiration installed. |
03-JAN-16 |
OZONE : Exhaust tubing run in insulation with sample tubing |
09-JUL-14 |
OZONE : New certification range for site transfer standard |
01-JUL-14 |
OZONE : Knock-out bottle removed. |
27-JAN-14 |
OZONE : Foam insulation added to sample line. |
27-JAN-14 |
OZONE : ZSP order changed to SPZ. |
27-JAN-14 |
WETNESS : Sensor unwired. |
28-MAR-12 |
OZONE : Replacement pressure transducer installed in site analyzer. |
25-JAN-12 |
OZONE : 10 ft. exhaust tubing added to both analyzers. |
25-JAN-12 |
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. |
02-FEB-11 |
OZONE : Ozone tubing changed from 3/8 inch to 1/4 inch. |
02-FEB-11 |
DATALOGGER : CR3000 datalogger installed. Wiring standardized. |
15-JUL-08 |