Jump to main content or area navigation.

Contact Us

Huntington Wildlife Forest (HWF187)

Site Photos
Site Information
Site ID HWF187
Site name Huntington Wildlife Forest
County Essex
State abbreviation NY
Latitude; decimal degrees 43.973044
Longitude; decimal degrees -74.223317
Elevation; m 497
Operating agency EPA
Start date 05/28/2002
Primary Land Use Forest
Terrain surrounding site Complex
NADP site code NY20
Distance to nearest NADP site; km .0079
AMoN Site ID NY20
View Map View Map
Graphical Results
Composition of total nitrogen deposition by species
Trends in total nitrogen deposition
Trends in wet and dry nitrogen deposition
Composition of total sulfur deposition by species
Trends in total sulfur deposition
Trends in wet and dry sulfur deposition
Trend in ozone 8-hour average concentrations
Site History
RELATIVE_HUMIDITY : Sensor unwired. 27-OCT-15
WINDSPEED_SCALAR : Sensor unwired. 27-OCT-15
WIND_DIRECTION : Sensor unwired. 27-OCT-15
WINDSPEED : Sensor unwired. 27-OCT-15
TEMP2 : Sensor unwired. 27-OCT-15
SIGMA_THETA : Sensor unwired. 27-OCT-15
TEMPERATURE : 9m temperature measurement with passive aspiration installed. 27-OCT-15
OZONE : Air compressor with silica gel and charcoal canisters installed for ozone zero air 06-MAY-15
OZONE : Ozone sample and gal gas tubing changed to smaller ID PFA tubing 01-APR-15
WETNESS : Sensor unwired 17-NOV-14
WINDSPEED_SCALAR : Sensor unwired 17-NOV-14
SIGMA_THETA : Sensor unwired 17-NOV-14
PRECIPITATION : Sensor unwired 17-NOV-14
WIND_DIRECTION : Sensor unwired 17-NOV-14
WINDSPEED : Sensor unwired 17-NOV-14
SOLAR_RADIATION : Sensor unwired 17-NOV-14
RELATIVE_HUMIDITY : Sensor unwired 17-NOV-14
TEMPERATURE_DELTA : Sensor unwired 17-NOV-14
NOY : Dryer installed in NO/NOy bypass box 27-OCT-14
NOYDIF : Dryer installed in NO/NOy bypass box 27-OCT-14
NO : Dryer installed in NO/NOy bypass box 27-OCT-14
NOYDIF : Dryer installed in NO/NOy bypass box 27-OCT-14
OZONE : Knock-out bottle removed. 15-OCT-14
OZONE : Foam insulation added to sample line. 01-AUG-14
OZONE : New certification range for site transfer standard 03-APR-14
OZONE : ZSP order changed to SPZ 24-SEP-13
OZONE : 10 ft. exhaust tubing added to both analyzers. 24-APR-12
OZONE : Replacement pressure transducer installed in site analyzer. 24-APR-12
OZONE : Ozone sample line filter removed from inside the shelter. 04-APR-11
OZONE : Ozone tubing changed from 3/8 inch to 1/4 inch. 04-APR-11
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. 04-APR-11
OZONE : Prototype 40CFR Part 58 ozone site installed using ozone generator as site transfer standard. 28-OCT-09
DATALOGGER : CR3000 datalogger installed. Wiring standardized. 30-MAY-08

Jump to main content.