Jump to main content or area navigation.

Contact Us

Georgia Station (GAS153)

Site Photos
Site Information
Site ID GAS153
Site name Georgia Station
County Pike
State abbreviation GA
AQS ID 132319991
Latitude; decimal degrees 33.181173
Longitude; decimal degrees -84.410054
Elevation; m 265
Operating agency EPA
Start date 04/21/1988
Primary Land Use Agric
Terrain surrounding site Rolling
NADP/NTN site ID GA41
Distance to nearest NTN site; km .078
Co-located NADP/AMoN Site ID GA41
View Map View Map
Graphical Results
Composition of total nitrogen deposition by species
Trends in total nitrogen deposition
Trends in wet and dry nitrogen deposition
Composition of total sulfur deposition by species
Trends in total sulfur deposition
Trends in wet and dry sulfur deposition
Trend in maximum 8-hour average ozone concentrations
Trend in 3-year average of ozone W126 index
Site History
OZONE : Ozone dryer installed 22-JUL-17
WIND_DIRECTION : Sensor unwired. 01-JAN-16
WINDSPEED_SCALAR : Sensor unwired. 01-JAN-16
WINDSPEED : Sensor unwired. 01-JAN-16
SIGMA_THETA : Sensor unwired. 01-JAN-16
TEMP2 : Sensor unwired. 01-JAN-16
RELATIVE_HUMIDITY : Sensor unwired. 01-JAN-16
SHELTER_TEMPERATURE : A/C and Heat logger control installed. 01-JAN-16
TEMPERATURE : 9m temperature measurement with passive aspiration installed. 01-JAN-16
OZONE : New certification range for site transfer standard 11-JUL-14
OZONE : Knock-out bottle removed. 28-JAN-14
OZONE : Foam insulation added to sample line. 28-JAN-14
OZONE : ZSP order changed to SPZ. 28-JAN-14
OZONE : 10 ft. exhaust tubing added to both analyzers. 06-JAN-12
OZONE : Site analyzer with replacement pressure transducer installed. 06-JAN-12
OZONE : Ozone sample line filter removed from inside the shelter. 01-JUL-11
OZONE : Ozone sample line filter removed from inside the shelter. 12-APR-11
OZONE : 40CFR Part 58 ozone site upgrade completed using Level 2 site transfer standard. 23-JAN-11
OZONE : Ozone tubing changed from 3/8 inch to 1/4 inch. 23-JAN-11
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. 14-JUL-10
OZONE : Prototype 40CFR Part 58 ozone site installed using ozone generator as site transfer standard. 15-OCT-09
DATALOGGER : CR3000 datalogger installed. Wiring standardized. 05-AUG-08

Jump to main content.