| Site Information |
| Site ID |
CTH110 |
| Site name |
Connecticut Hill |
| County |
Tompkins |
| State abbreviation |
NY |
| AQS ID |
361099991 |
| Latitude; decimal degrees |
42.400875 |
| Longitude; decimal degrees |
-76.653516 |
| Elevation; m |
511 |
| Operating agency |
EPA |
| Start date |
08/21/1987 |
| Primary Land Use |
Forest |
| Terrain surrounding site |
Rolling |
| NADP/NTN site ID |
NY67 |
| Distance to nearest NTN site; km |
.447 |
| Co-located NADP/AMoN Site ID |
NY67 |
| View Map |
View Map |
|
| Graphical Results |
| Composition of total nitrogen deposition by species |
 |
| Trends in total nitrogen deposition |
 |
| Trends in wet and dry nitrogen deposition |
 |
| Composition of total sulfur deposition by species |
 |
| Trends in total sulfur deposition |
 |
| Trends in wet and dry sulfur deposition |
 |
| Trend in maximum 8-hour average ozone concentrations |
 |
| Trend in 3-year average of ozone W126 index |
 |
|
|
|
| Site History |
| OZONE : Ozone dryer installed |
26-AUG-17 |
| TEMP2 : Sensor unwired. |
05-FEB-16 |
| WIND_DIRECTION : Sensor unwired. |
05-FEB-16 |
| WINDSPEED : Sensor unwired. |
05-FEB-16 |
| RELATIVE_HUMIDITY : Sensor unwired. |
05-FEB-16 |
| SIGMA_THETA : Sensor unwired. |
05-FEB-16 |
| WINDSPEED_SCALAR : Sensor unwired. |
05-FEB-16 |
| TEMPERATURE : 9m temperature measurement with passive aspiration installed. |
05-FEB-16 |
| SHELTER_TEMPERATURE : A/C and Heat logger control installed. |
14-AUG-15 |
| OZONE : New certification range for site transfer standard |
07-AUG-14 |
| OZONE : ZSP order changed to SPZ. |
23-FEB-14 |
| OZONE : Foam insulation added to sample line. |
23-FEB-14 |
| OZONE : Knock-out bottle removed. |
23-FEB-14 |
| OZONE : Replacement pressure transducer installed in site analyzer. |
19-FEB-12 |
| OZONE : 10 ft. exhaust tubing added to both analyzers. |
19-FEB-12 |
| OZONE : Ozone sample line filter removed from inside the shelter. |
02-AUG-11 |
| OZONE : 40CFR Part 58 ozone site upgrade completed using Level 2 site transfer standard. |
10-FEB-11 |
| OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. |
25-JUL-10 |
| DATALOGGER : CR3000 datalogger installed. Wiring standardized. |
10-FEB-09 |