Jump to main content or area navigation.

Contact Us

Bondville (BVL130)

Site Photos
Site Information
Site ID BVL130
Site name Bondville
County Champaign
State abbreviation IL
AQS ID 170191001
Latitude; decimal degrees 40.051981
Longitude; decimal degrees -88.372495
Elevation; m 213
Operating agency EPA
Start date 02/01/1988
Primary Land Use Agric
Terrain surrounding site Flat
NADP/NTN site ID IL11
Distance to nearest NTN site; km .104
Co-located NADP/AMoN Site ID IL11
View Map View Map
Graphical Results
Composition of total nitrogen deposition by species
Trends in total nitrogen deposition
Trends in wet and dry nitrogen deposition
Composition of total sulfur deposition by species
Trends in total sulfur deposition
Trends in wet and dry sulfur deposition
Trend in maximum 8-hour average ozone concentrations
Trend in 3-year average of ozone W126 index
Site History
SHELTER_TEMPERATURE : A/C and Heat logger control installed. 24-SEP-15
OZONE : Air compressor with silica gel and charcoal canisters installed for ozone zero air 25-AUG-15
WIND_DIRECTION : Changed from Climatronics to RMY 21-MAR-15
TEMP : Changed from Climatronics to RMY 21-MAR-15
TEMP2 : Changed from Climatronics to RMY 21-MAR-15
WINDSPEED_SCALAR : Changed from Climatronics to RMY 21-MAR-15
SIGMA_THETA : Changed from Climatronics to RMY 21-MAR-15
WINDSPEED : Changed from Climatronics to RMY 21-MAR-15
RELATIVE_HUMIDITY : Changed from Climatronics to RMY 21-MAR-15
OZONE : New certification range for site transfer standard 10-SEP-14
TEMPERATURE : Collocated 9m temperature measurement with passive aspiration installed. 08-SEP-14
OZONE : Knockout bottle removed. 22-MAR-14
OZONE : ZSP order changed to SPZ. 24-SEP-13
SHELTER_TEMPERATURE : Measurement related equipment moved to new shelter. 06-JUN-12
TEMPERATURE : Measurement related equipment moved to new shelter. 06-JUN-12
OZONE : Measurement related equipment moved to new shelter. 06-JUN-12
FLOW_RATE : Measurement related equipment moved to new shelter. 06-JUN-12
OZONE : 10 ft. exhaust tubing added to both analyzers. 04-MAR-12
OZONE : Replacement pressure transducer installed in site analyzer. 04-MAR-12
TEMPERATURE : Collocated 9m temperature measurement with passive aspiration installed. 06-SEP-11
OZONE : Ozone sample line filter removed from inside the shelter. 22-MAR-11
OZONE : Ozone tubing changed from 3/8 inch to 1/4 inch. 22-MAR-11
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. 22-MAR-11
DATALOGGER : CR3000 datalogger installed. Wiring standardized. 08-MAR-09

Jump to main content.