Jump to main content or area navigation.

Contact Us

Beaufort (BFT142)

Site Photos
Site Information
Site ID BFT142
Site name Beaufort
County Carteret
State abbreviation NC
AQS ID 370319991
Latitude; decimal degrees 34.884668
Longitude; decimal degrees -76.620666
Elevation; m 5
Operating agency EPA
Start date 12/28/1993
Primary Land Use Agric
Terrain surrounding site Flat
NADP/NTN site ID NC06
Distance to nearest NTN site; km .008
Co-located NADP/AMoN Site ID NC06
View Map View Map
Graphical Results
Composition of total nitrogen deposition by species
Trends in total nitrogen deposition
Trends in wet and dry nitrogen deposition
Composition of total sulfur deposition by species
Trends in total sulfur deposition
Trends in wet and dry sulfur deposition
Trend in maximum 8-hour average ozone concentrations
Trend in 3-year average of ozone W126 index
Site History
OZONE : Ozone dryer installed 17-JUL-17
SHELTER_TEMPERATURE : A/C and Heat logger control installed. 05-JAN-16
OZONE : Exhaust tubing run in insulation with sample tubing 16-JUL-14
OZONE : Knockout bottle reinstalled in ozone sample line. 08-JUL-14
OZONE : New certification range for site transfer standard 24-JAN-14
OZONE : ZSP order changed to SPZ. 24-JAN-14
OZONE : Knock-out bottle removed. 24-JAN-14
OZONE : Foam insulation added to sample line. 24-JAN-14
TEMPERATURE : 9m temperature measurement with passive aspiration installed. 05-JAN-12
OZONE : 10 ft. exhaust tubing added to both analyzers. 05-JAN-12
RELATIVE_HUMIDITY : Sensor unwired. 05-JAN-12
TEMP2 : Sensor unwired. 05-JAN-12
OZONE : Replacement pressure transducer installed in site analyzer. 05-JAN-12
SOLAR_RADIATION : Sensor unwired. 02-SEP-11
WETNESS : Sensor unwired. 02-SEP-11
RELATIVE_HUMIDITY : Sensor unwired. 02-SEP-11
OZONE : Ozone sample line filter removed from inside the shelter. 08-MAR-11
OZONE : Ozone tubing changed from 3/8 inch to 1/4 inch. 24-FEB-11
OZONE : 40CFR Part 58 ozone site upgrade completed using Level 2 site transfer standard. 24-FEB-11
OZONE : Pressure transducer replaced in the site analyzer. 24-FEB-11
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. 23-JUL-10
DATALOGGER : CR3000 datalogger installed. Wiring standardized. 23-JUL-08

Jump to main content.