| SHELTER_TEMPERATURE : A/C and Heat logger control installed. |
04-FEB-16 |
| TEMPERATURE : 9m temperature measurement with passive aspiration installed. |
21-FEB-15 |
| TEMPERATURE : Changed from Climatronics to RMY |
21-FEB-15 |
| SIGMA_THETA : Sensor unwired. |
18-FEB-15 |
| RELATIVE_HUMIDITY : Sensor unwired. |
18-FEB-15 |
| WINDSPEED : Sensor unwired. |
18-FEB-15 |
| WIND_DIRECTION : Sensor unwired. |
18-FEB-15 |
| TEMP2 : Sensor unwired. |
18-FEB-15 |
| WINDSPEED_SCALAR : Sensor unwired. |
18-FEB-15 |
| OZONE : Exhaust tubing run in insulation with sample tubing |
02-SEP-14 |
| OZONE : New certification range for site transfer standard |
09-AUG-14 |
| OZONE : Knock-out bottle removed. |
20-FEB-14 |
| OZONE : ZSP order changed to SPZ. |
20-FEB-14 |
| OZONE : Foam insulation added to sample line. |
20-FEB-14 |
| OZONE : 10 ft. exhaust tubing added to both analyzers. |
16-FEB-12 |
| OZONE : Site analyzer with replacement pressure transducer installed. |
10-JAN-12 |
| OZONE : Ozone sample line filter removed from inside the shelter. |
02-JUN-11 |
| OZONE : 40CFR Part 58 ozone site upgrade completed using Level 2 site transfer standard. |
07-FEB-11 |
| OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. |
27-JUL-10 |
| DATALOGGER : CR3000 datalogger installed. Wiring standardized. |
23-FEB-09 |