Alabama-Coushatta Tribe of Texas (ALC188)
|
Site History | |||
---|---|---|---|
OZONE : Ozone dryer installed | 14-JUL-17 | ||
WIND_DIRECTION : Sensor unwired. | 23-SEP-15 | ||
RELATIVE_HUMIDITY : Sensor unwired. | 23-SEP-15 | ||
SIGMA_THETA : Sensor unwired. | 23-SEP-15 | ||
TEMP2 : Sensor unwired. | 23-SEP-15 | ||
TEMPERATURE : 9m temperature measurement with passive aspiration installed. | 23-SEP-15 | ||
WINDSPEED : Sensor unwired. | 23-SEP-15 | ||
WINDSPEED_SCALAR : Sensor unwired. | 23-SEP-15 | ||
OZONE : Knockout bottle reinstalled on ozone sample line. | 09-JUL-14 | ||
OZONE : New analyzer and new sample tubing installed | 25-JUN-14 | ||
OZONE : Exhaust tubing run in insulation with sample tubing | 25-JUN-14 | ||
OZONE : Foam insulation added to sample line. | 25-MAR-14 | ||
OZONE : Knock-out bottle removed. | 25-MAR-14 | ||
OZONE : New certification range for site transfer standard | 25-MAR-14 | ||
OZONE : ZSP order changed to SPZ. | 04-SEP-13 | ||
OZONE : 10 ft. exhaust tubing added to both analyzers. | 28-MAR-12 | ||
OZONE : Replacement pressure transducer installed in site analyzer. | 28-MAR-12 | ||
RELATIVE_HUMIDITY : Sensor unwired. | 27-SEP-11 | ||
OZONE : Ozone tubing changed from 3/8 inch to 1/4 inch. | 30-MAR-11 | ||
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. | 30-MAR-11 | ||
OZONE : Ozone sample line filter removed from inside the shelter. | 30-MAR-11 | ||
DATALOGGER : CR3000 datalogger installed. Wiring standardized. | 24-MAR-09 |