- Name of facility :
-
Detroit Edison, Belle River Power Plant
- Location:
-
China Township, St. Clair County, MI 48054
- Distance from U.S./Canada border:
-
within 30 miles or 48 km.
- Type and size of Facility:
-
Installing three 82.4 MW turbines and modifying three existing turbines
rated at 82.4 MW
- Source of Emissions:
-
Combustion turbine
- Type of fuel:
-
natural gas
- Type and quantity of emissions:
-
Major for NOx (465 tpy), CO (770 tpy), and PM10
- Emission control technology:
-
low NOx burners; good combustion practices
- Date permit application received:
-
EPA received application 8/28/00.
- Stack height and diameter:
-
Proposed stack parameters - minimum height 56 feet, and maximum dimension
of 108 in. by 228 in
- Permitting Authority:
-
Michigan Department of Environmental Quality
Contact Lori Peacock at 517-373-7082