SHELTER_TEMPERATURE : A/C and Heat logger control installed. |
04-NOV-15 |
OZONE : Knock-out bottle removed. |
19-MAY-14 |
OZONE : Foam insulation added to sample line. |
19-MAY-14 |
OZONE : New sample tubing installed |
19-MAY-14 |
OZONE : ZSP order changed to SPZ. |
19-MAY-14 |
OZONE : 10 ft. exhaust tubing added to both analyzers. |
08-MAY-12 |
OZONE : Replacement pressure transducer installed in site analyzer. |
08-MAY-12 |
RELATIVE_HUMIDITY : Sensor unwired. |
08-NOV-11 |
TEMPERATURE : 9m temperature measurement with passive aspiration installed. |
08-NOV-11 |
SIGMA_THETA : Sensor unwired. |
08-NOV-11 |
WINDSPEED_SCALAR : Sensor unwired. |
08-NOV-11 |
WIND_DIRECTION : Sensor unwired. |
08-NOV-11 |
WINDSPEED : Sensor unwired. |
08-NOV-11 |
TEMP2 : Sensor unwired. |
08-NOV-11 |
TEMP2 : Sensor unwired. |
13-OCT-11 |
OZONE : 40CFR Part 58 ozone site installed using independent site transfer standard. |
03-MAY-11 |
OZONE : Ozone sample line filter removed from inside the shelter. |
03-MAY-11 |
DATALOGGER : CR3000 datalogger installed. Wiring standardized. |
21-NOV-08 |